Skip to main content

Tolled freeway to Melbourne Airport due to undergo US$788.29mn widening

Australian developer and operator of tolled roads, Transurban, is planning to spend US$788.29 million (AUD 850 million) to widen an eight-lane tolled section of Tullamarine freeway leading to Melbourne Airport.
April 29, 2014 Read time: 1 min
Australian developer and operator of tolled roads, 891 Transurban, is planning to spend US$788.29 million (AUD 850 million) to widen an eight-lane tolled section of Tullamarine freeway leading to Melbourne Airport.

Transurban expects to complete the project in two years and construction is scheduled to start in 2015. The company owns 50% stake in M1 Eastern Distributor, M7 and M5 roads in Sydney and owns the Hills Motorway. Transurban has operational rights in the Cross City Tunnel.

For more information on companies in this article

Related Content

  • Brisbane’s Clem Jones tolled road tunnel goes up for sale
    April 30, 2013
    KordaMentha, a receiver, and investment bank Goldman Sachs have put the Clem Jones tolled road tunnel in Brisbane, Australia up for sale. Queensland Motorways as well as local and overseas pension funds are reported to be planning to bid for the asset, estimated to be worth US$617.15 million (AUD 600mn). The closing date for first round bids is expected in middle of June 2013 and completion of the deal is scheduled at the end of September 2013. The Clem Jones tunnel is owned by River City and the company ha
  • S&P Global Rating: credit stability for toll road operators
    August 14, 2017
    The outlook is generally stable for business conditions and credit quality for toll roads worldwide, according to the latest survey from ratings agency S&P Global.The exception is the US where the overall outlook is “positive”, noted the report S&P Global Ratings' 2017. The 21-page report considers broad economic and industry-specific trends. It looks at economic conditions, demographic trends and geopolitical risks that affect the movement of people and goods. “We expect stable or improving, but still frag
  • Australia: Consortium ready to abandon Melbourne’s East West Link
    March 10, 2015
    The East West Connect consortium is set to abandon Melbourne’s East West Link contract in return for a payment of between US$400 million and $535 million, according to media reports. But the Victoria state government is challenging the claim by East West Connect whose partners include Lend Lease, Acciona, Capella Capital and Bouygues. Instead, the government wants East West to payback around $153 million which the consortium allegedly received when the toll road contract was signed, reported the Herald Sun
  • EastLink demonstrates hands-free driving in Melbourne
    April 10, 2018
    A motorway operator in Australia’s Victoria state has televised a live demonstration of automated driving along a section of one of its roads. The demonstration was along a route of the EastLink, an electronically tolled section of the M3 freeway through the eastern and south-eastern suburbs of Melbourne. EastLink is part of Melbourne's Metropolitan Ring Road project. ConnectEast is an Australian company responsible for the finance, design, construction and operation of EastLink which cost nearly US$2 bi