Skip to main content

Texas Transportation tollway being previewed

A US$1.5 billion Interstate project is being put forward for approval in the US State of Texas. The LBJ East project is being proposed the city of Dallas and will be an 18km stretch of Interstate 635 that will connect Central Expressway with Interstate 30. The project has been planned by the Texas Transportation Department and is intended to boost capacity in the areas around Lake Highland, Garland, Far East Dallas and Mesquite. The proposed route calls for two of the seven lanes on the widened Interstate s
January 31, 2017 Read time: 2 mins
A US$1.5 billion Interstate project is being put forward for approval in the US State of Texas. The LBJ East project is being proposed the city of Dallas and will be an 18km stretch of Interstate 635 that will connect Central Expressway with Interstate 30. The project has been planned by the Texas Transportation Department and is intended to boost capacity in the areas around Lake Highland, Garland, Far East Dallas and Mesquite. The proposed route calls for two of the seven lanes on the widened Interstate stretch to be tolled and these would be linked to similarly tolled lanes on a section of the Central Expressway. By having two lanes on the LBJ East route operating under a tolling system, this will help deliver sufficient revenue to fund around 1/3rd of the total project costs. For the project to get the go ahead, it does require the official approval of state lawmakers for Texas however. This legal requirement has so far slowed progress with the project, delaying the start of construction works to 2020 and with the link now expected to open to traffic in 2024.

Related Content

  • Texas highway deal for joint venture
    August 12, 2021
    An important Texas highway project is being carried out by a joint venture.
  • Texas set to approve extension to Texas 249 and US 290 in 2016
    January 5, 2016
    The Texas Department of Transportation is poised to give the go-ahead to US$1.27 billion worth of freeway to start this year. Plans include extensions to Texas 249 and US 290 in order to give Waller County greater access to major freeways and tollways, according to media reports. The biggest project, which is expected to begin this summer, is the addition of toll lanes to Texas 288, costing $800 million. Work will also be carried out at interchanges between the 288 toll road, Loop 610 and the Sam Hous
  • Florida highway rebuild project
    May 2, 2018
    Rebuilding a congested stretch of highway in Florida will cut congestion and boost safety for commuters - Mike Woof writes. Florida’s 214km-long I-4 highway provides a key transport route between Tampa and Daytona Beach, but has an unenviable reputation for both congestion and safety, with frequent delays due to heavy traffic as well as crashes. The stretch running through the city of Orlando is particularly prone to jams at peak periods, with huge traffic volumes resulting in vehicles having to slow to a c
  • Texas highway contract awarded to Ferrovial
    April 16, 2021
    A key Texas highway contract has been awarded to Ferrovial and its subsidiary.