Skip to main content

Raised dual carriageway reduces congestion

A new raised dual carriageway to bypass the historic centre of the City of Wroclaw in south-east Poland will give access to the new Miejski Stadium in time for its role in the UEFA Euro 2012 football finals.
February 21, 2012 Read time: 2 mins
Tensar's Tensartech retaining wall solution helped construct the Wroclaw bypass utilizing reinforced soil technology compromising uniaxial geogrid layered within aggregate(see inset)
A new raised dual carriageway to bypass the historic centre of the City of Wroclaw in south-east Poland will give access to the new Miejski Stadium in time for its role in the UEFA Euro 2012 football finals.

Wroclaw Municipality and its main contractor, 2296 Skanska, chose the 340 Tensar Tensartech TW1 structural and retaining walls solution for the 5km bypass project because of its low material costs and rapid construction, as well as its aesthetic appearance and versatility in adapting to site requirements.

Traffic conditions in Wroclaw are frequently very congested due to the narrow streets of the centre, and it can take two hours or more to transverse the city, located on a major connecting route across southern Poland.

Started in 2008, the new bypass route is elevated on embankments up to 11m high in order to cross the River Oder, the railway and local roads: this will carry through traffic and football fans away from the city centre.

A total of 19 separate Tensartech walls were built for the embankment, with ten incorporated into bridge abutments and flyovers, and construction will be completed in 2011.

Jacek Kawalec of Tensar International, who provided Tensar application advice, said: “Three different techniques were considered for the project. Two involved heavy concrete blocks or large cast concrete panels. Both would have been too costly and time-consuming to construct, and their appearance would have been unsympathetic to the historic architecture.

“The Tensartech TW1 system is fairly new in Poland, and uses split-face blocks produced locally to Tensar’s exacting standards. In total, the 19 walls of TW1 amounted to 2km in length, supplemented by around 300m of gabion walling, over 12,000m2 of wall in total, designed by Drotest.”

The ground over which the embankments were built comprises compacted sands and firm-plastic loams with few load-bearing problems. The locally-sourced mineral aggregate fill was layered with Tensar uniaxial geogrid to form mechanically stabilised soil layers within the embankments, fastened to the dry laid TW1 blocks by Tensar’s polymer key.

For more information on companies in this article

Related Content

  • Geosynthetic solution for ground preparation
    April 16, 2012
    Naue Geosynthetics says its Secugrid offers a solution for a host of ground preparation problems, and for use in reinforced retaining walls. Secugrid is a geogrid made from extruded monolithic flat bars with welded junctions, for soil reinforcement in earth, landfill and road construction as well as in hydraulic engineering applications. Among its benefits are said to be its high strength and low elongation thanks to the extruded elements. "The monolithic flat bars give it a robust construction, an
  • Tensar’s Glasstex makes the grade in UK’s Smart Motorway upgrade
    February 27, 2017
    A Stress Absorbing Membrane Interlayer is delivering stronger, safer and more reliable surfaces for the UK’s M3 Smart Motorways project in the southern England.
  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci