Skip to main content

Poland: €7.57bn road budget call

The Polish highway authorities are calling for a road budget of e7.57 billion for 2011, and while this will have to be approved by the government, it is some e1.56 billion lower than originally planned.
February 20, 2012 Read time: 2 mins
The Polish highway authorities are calling for a road budget of €7.57 billion for 2011, and while this will have to be approved by the government, it is some e1.56 billion lower than originally planned.

Of the total, €754.5 million would be allocated for the maintenance of roads and the General Directorate for National Roads and Motorways (1361 GDDKiA), slightly more than the €681.3 million planned earlier.

Meanwhile, a settlement has been reached between the Polish authorities and Austrian contractor 2859 Alpine regarding an 18km section of the A1 highway. The €139 million deal is for a section of the highway in Silesia in the south of the country and includes work on 32 bridges.

The project has some history as Alpine was previously awarded the contract but then it lost it in 2009 following a series of disagreements over the schedule as well as the construction of a bridge.

In a separate deal with a different contractor, work is to go ahead on a stretch of the A2 highway between Pruszkow and the junction serving Konopta, a 7.1km section of highway that will cost €107.33 million. Work includes erecting two junctions, as well as bridges, lighting and acoustic and anti-vibration screens. The A2 highway runs west to east across Poland through the central belt of the country, connecting Poland with neighbouring Germany and Belarus.

A deal has also been struck for EU funding for a €82.5 million bridge project over the Vistula River in Poland, which is to be built by a consortium comprising 945 Strabag and 2861 Hermann Kirchner Polska.

For more information on companies in this article

Related Content

  • Polish road authority GDDKiA will re-tender for the S14
    May 12, 2017
    The Polish ministry of infrastructure announced that it will retender for building the last 27km section of the Expressway S14 around Lodz. Poland’s road authority GDDKiA said it was not satisfied with the offers it had received during the tender. They were higher than the budget by around €59 million, reaching upwards of €487 million. Local governments reportedly fear that construction delays could disrupt the Specialised Expo from June to September, 2022 if the city of Lodz were to be chosen. The wining c
  • Poland-Germany tunnel project planned
    August 17, 2018
    A new road tunnel is planned to connect Poland’s Wollin Island with Usedom Island in Germany. The project is expected to cost €225 million. The project was originally intended to be built by an Italian contractor, however an Austrian firm now looks likely to build the link. The tunnel plans call for a 1.4km link to be constructed using a TBM. The tunnel would replace the ferry service operating at present, improving transport connections for the northern Polish city of Swinoujscie.
  • Galliford Try aims to downsize its construction business
    April 25, 2019
    UK construction and infrastructure business Galliford Try is reviewing its construction business with a view to downsizing. “The review will reduce the size of the construction business, focusing on its key strengths in markets and sectors with sustainable prospects for profitability and growth, where we have a track record of success,” the company said in a written statement. “The board anticipates that this review will result in reduced profitability in the current year reflecting a reassessment of
  • Slovakia highway construction deal signed
    April 12, 2017
    Plans are now going ahead in Slovakia for a key stretch of the D1 highway project. This 8km Presov West-Presov South section will cost €356 million to construct. The project will be carried out by the D1 Presov Consortium. The project partners in the consortium comprise Eurovia SK, Eurovia CS, Doprastav, Metrostav and Metrostav Slovakia. The agreement with the consortium was reached with Slovakia's National Highway Company (NDS), which awarded the package of works. Construction will commence in June 2017 an