Skip to main content

Poland: €7.57bn road budget call

The Polish highway authorities are calling for a road budget of e7.57 billion for 2011, and while this will have to be approved by the government, it is some e1.56 billion lower than originally planned.
February 20, 2012 Read time: 2 mins
The Polish highway authorities are calling for a road budget of €7.57 billion for 2011, and while this will have to be approved by the government, it is some e1.56 billion lower than originally planned.

Of the total, €754.5 million would be allocated for the maintenance of roads and the General Directorate for National Roads and Motorways (1361 GDDKiA), slightly more than the €681.3 million planned earlier.

Meanwhile, a settlement has been reached between the Polish authorities and Austrian contractor 2859 Alpine regarding an 18km section of the A1 highway. The €139 million deal is for a section of the highway in Silesia in the south of the country and includes work on 32 bridges.

The project has some history as Alpine was previously awarded the contract but then it lost it in 2009 following a series of disagreements over the schedule as well as the construction of a bridge.

In a separate deal with a different contractor, work is to go ahead on a stretch of the A2 highway between Pruszkow and the junction serving Konopta, a 7.1km section of highway that will cost €107.33 million. Work includes erecting two junctions, as well as bridges, lighting and acoustic and anti-vibration screens. The A2 highway runs west to east across Poland through the central belt of the country, connecting Poland with neighbouring Germany and Belarus.

A deal has also been struck for EU funding for a €82.5 million bridge project over the Vistula River in Poland, which is to be built by a consortium comprising 945 Strabag and 2861 Hermann Kirchner Polska.

For more information on companies in this article

Related Content

  • Strabag wins Polish road contract
    September 17, 2018
    Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.
  • Mostostal Warszawa makes lowest bids in Poland’s S9 tenders
    November 24, 2017
    A Mostostal Warszawa consortium has reportedly made the lowest bids to build three sections of the S19 from Nisko to Sokolow Malopolski in south-eastern Poland. The consortium’s bid was just over €187 million in total. Other bids which were received from a Strabag consortium and a Budimex consortium.
  • Budimex and Strabag win 16km of Poland’s four-lane A1
    August 6, 2018
    Budimex and Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów. The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months. The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.
  • Poland is planning a series of highway projects
    March 15, 2013
    Poland’s Ministry of Transport plans to invest heavily in road projects from 2014-2020. The Polish road authority, GDDKiA, will invest €16.91 billion in new roads. A key project will be for the section of the Berlin-Lisbon A2 highway that runs through Poland. This will run through Zakret near Warsaw and connect to the Minsk Mazowiecki ring road and is expected to cost close to €1.7 billion. Meanwhile the A1 highway linking Pyrzowice and Tuszyn will cost in excess of €1.8 billion. GDDKiA is also planning to