Skip to main content

Poland: €7.57bn road budget call

The Polish highway authorities are calling for a road budget of e7.57 billion for 2011, and while this will have to be approved by the government, it is some e1.56 billion lower than originally planned.
February 20, 2012 Read time: 2 mins
The Polish highway authorities are calling for a road budget of €7.57 billion for 2011, and while this will have to be approved by the government, it is some e1.56 billion lower than originally planned.

Of the total, €754.5 million would be allocated for the maintenance of roads and the General Directorate for National Roads and Motorways (1361 GDDKiA), slightly more than the €681.3 million planned earlier.

Meanwhile, a settlement has been reached between the Polish authorities and Austrian contractor 2859 Alpine regarding an 18km section of the A1 highway. The €139 million deal is for a section of the highway in Silesia in the south of the country and includes work on 32 bridges.

The project has some history as Alpine was previously awarded the contract but then it lost it in 2009 following a series of disagreements over the schedule as well as the construction of a bridge.

In a separate deal with a different contractor, work is to go ahead on a stretch of the A2 highway between Pruszkow and the junction serving Konopta, a 7.1km section of highway that will cost €107.33 million. Work includes erecting two junctions, as well as bridges, lighting and acoustic and anti-vibration screens. The A2 highway runs west to east across Poland through the central belt of the country, connecting Poland with neighbouring Germany and Belarus.

A deal has also been struck for EU funding for a €82.5 million bridge project over the Vistula River in Poland, which is to be built by a consortium comprising 945 Strabag and 2861 Hermann Kirchner Polska.

For more information on companies in this article

Related Content

  • India highway link opens to traffic
    March 6, 2018
    A new stretch of highway is now opening to traffic in India. The 80km stretch of highway runs between Kundli and through Manesar to Palwal. Called the KMP Expressway, the route has had something of a checkered history and has been completed somewhat later than originally intended. The concession was originally awarded in 2006 and the road should have been completed in 2009, according to the planned timeline.
  • Mini-bridge aids Forth repairs
    July 17, 2012
    An engineering "first" means that rehabilitation work on a vital Scottish bridge built over 40 years ago can be carried out smoothly A new report to the Forth Estuary Transport Authority (FETA) in Scotland recommends appointing Balfour Beatty Civil Engineering of Edinburgh as 'preferred bidder' to carry out the scheduled replacement of the bridge's main expansion joints in 2009. However, the report to the bridge authority says the tender price of £13.7 million (US$21.3 million) is some £5 million ($7.8 mill
  • Nepal's new bridge link
    February 13, 2012
    Construction work is underway in Nepal on one of the biggest box-girder bridges ever built in the country. The bridge is located in Mid West Nepal and measures just over 1km long.
  • Strabag reports output volume remained flat for year end 2014
    February 16, 2015
    Austrian construction giant Strabag reported output volume of €13.6 billion to year end 2014 was unchanged from last year. The publically listed group, with headquarters in Vienna, said declines in contracts in some countries were offset with increases in the home markets of Germany and Austria, despite a “very restrained tender award policy” for the public sector. Large projects were completed in Romania and Russia at the same time that newly acquired orders in these markets have not yet come on stream.