Skip to main content

New Turkish bridge opens to traffic

Turkey’s new Osman Gazi Bridge has now opened for traffic. This bridge can carry 40,000 vehicles/day, while halving the travel time needed using previous routes. This is a six lane suspension bridge measuring 3km and spanning the Sea of Marmara. Construction has taken 42 months and the structure has been designed to cope with the risk of earthquakes. The project has been co-ordinated by Japanese construction company IHI, with Siemens handling the role of electro and mechanical contractor. Siemens has dev
June 30, 2016 Read time: 3 mins
The new suspension Osman Gazi Bridge spanning the Sea of Marmara in Turkey has now opened for traffic - Image courtesy of www.siemens.com/press
Turkey’s new Osman Gazi Bridge has now opened for traffic. This bridge can carry 40,000 vehicles/day, while halving the travel time needed using previous routes. This is a six lane suspension bridge measuring 3km and spanning the Sea of Marmara. Construction has taken 42 months and the structure has been designed to cope with the risk of earthquakes.

The project has been co-ordinated by Japanese construction company IHI, with 1134 Siemens handling the role of electro and mechanical contractor. Siemens has developed, installed and commissioned all the bridge structure and traffic control components and systems. The six-lane bridge with separated maintenance lines is part of a freeway project linking the cities of Istanbul and İzmir in Western Turkey.

The bridge is constructed entirely from steel and with a main span of 1.55km, is suspended 64m above the Sea of Marmara. This lies to the south of Istanbul and is in a region that is prone to earthquakes. The structure had to be fitted with special technology to continuously measure vibration, movement and loads to give alarms to the bridge operators for all abnormal events.

Siemens equipped the bridge the 390 sensors to monitor its condition and raise the alarm in the event of excessive vibration. The sensors continuously measure longitudinal and lateral strain as well as the stress loads on the road sections leading up to the main span. Special GPS sensors fitted to the bridge register oscillations of the bridge piles, while wind and temperature measuring units are also provided.

Changes and potential damage to the bridge are also detected by the sensors, for instance to check the steel structure continuously for corrosion. In the interior chambers of the bridge, in the bridge towers and bridge decks as well as on the sheathed suspension cables, a special system controls and regulates atmospheric humidity, ensuring it remains below 40% to prevent corrosion from the sea air.

The construction of the bridge and the 409km-long highway between Istanbul and İzmir is part of the largest highway project in Turkey to date. The Concessionaire Otoyol Yatirim ve Isletme (3338 Nurol-7135 Özaltin-Maykol-1324 Astaldi-4149 Yüksel-Göcay) has been appointed under the terms of the build-operate-transfer (BOT) contract to plan and operate the new motorway over a period of 22 years. This new six-lane bridge connection will cut the travel time between both cities from eight to four hours.

For more information on companies in this article

Related Content

  • Braila Bridge in Romania inauguration
    June 27, 2023
    Romania’s landmark Braila Bridge link is having its official inauguration.
  • Turkish highways and bridge project financing secured
    June 7, 2018
    The financing package that will pay for Turkey’s €2.43 billion Malkara to Çanakkale highway and 1915 Çanakkale Bridge has now been secured. This follows on from Mott MacDonald completing its technical due diligence of the project documentation. The project will be handled under the PPP model. The centrepiece of the project is the €1.68 billion Çanakkale 1915 bridge. This will be over 4.6km long, with a 2,023m main span that will be the longest in the world for a suspension bridge. It will allow a clearance
  • Turkey’s 1915 Çanakkale Bridge opens
    April 11, 2022
    The bridge beats Japan’s Akashi Kaikyo Bridge to be the world’s longest suspension bridge.
  • Istanbul’s third bridge nearly ready
    February 2, 2015
    Work is progressing well in Turkey on the country’s landmark new bridge over the Bosporus. This will be Istanbul's third bridge, with the opening now planned for the 29th October 2015. The construction work is being carried out by the IC Ictas – Astaldi joint venture, which is handling the project under the build-operate-transfer (BOT) model. The project has an investment value of some US$2.5 billion. The landmark 3rd Bosporus Bridge, or Yavuz Sultan Selim Bridge, forms the centrepiece of the Northern Marma