Skip to main content

Kuwait bridge to feature tolling system

Kuwait is planning to introduce tolling on its Sheikh Jaber Al Ahmad Bridge. This 43km causeway will commence operation at the end of 2018. With the opening of the causeway, journey times between Kuwait City and the area around Subiya will be reduced as the driving distance will be cut from 104km at present to just 37.5km. The plan to toll the link has been initiated by the country’s Ministry of Public Works, in line with tolling measures on long bridge links elsewhere in the Middle East and Europe. The rat
August 10, 2017 Read time: 1 min

Kuwait is planning to introduce tolling on its Sheikh Jaber Al Ahmad Bridge. This 43km causeway will commence operation at the end of 2018. With the opening of the causeway, journey times between Kuwait City and the area around Subiya will be reduced as the driving distance will be cut from 104km at present to just 37.5km. The plan to toll the link has been initiated by the country’s Ministry of Public Works, in line with tolling measures on long bridge links elsewhere in the Middle East and Europe. The rates of the toll charges have still to be finalised but will be set so as to pay for the operation and maintenance of the link.

Related Content

  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno
  • Increasing importance of alternate truck routes
    February 14, 2012
    The fabled Silk Route from China to Europe takes many forms, and is again becoming increasingly important as Patrick Smithreports The ancient Silk Road was never a single caravan route, but covered hundreds of kilometres in width extending in length for around 10,000km. This is the view of the European International Road Transport Union (IRU), and many other countries and organisations, who point out that it is a system of routes covering many countries via a series of branch roads that dates back some 2
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public
  • Construction delays affect Bosnian highway project
    May 10, 2012
    In Bosnia, delays have affected the construction work on the country’s key Corridor 5c highway project. So far 37km of the 336km Corridor 5c highway has been built, with 21km under construction and a further 43km section being cleared for work to commence. Construction work on a section of the Corridor 5c highway is set to commence by the end of September 2011. The section of highway being built is located in Ljubuska and Capljina, with work staring on the 4km Kravica-Bijaca and due for completion in 10 mon