Skip to main content

Key project for US commences

In the US work is now commencing on the key I-269 highway upgrade at Byhalia in the state of Mississippi. The new US$19.5 million section now under construction will complete the beltway around nearby Memphis, Tennessee.
February 14, 2012 Read time: 2 mins
RSSIn the US work is now commencing on the key I-269 highway upgrade at Byhalia in the state of Mississippi. The new US$19.5 million section now under construction will complete the beltway around nearby Memphis, Tennessee. When completed in 2014, this first phase of Mississippi's portion of I-269 will provide 5km of new roadway and bridge construction from State Route 302 to the Mississippi/Tennessee state line. The new link is expected to reduce congestion and move traffic and freight throughout the state as well as in and around nearby Memphis. This will be the first of four phases of highway construction in Mississippi however. The completed I-269 loop in Mississippi is expected to cost $668.7 million and will provide a 40km direct connection from the existing I-55/I-69 Interchange to the Tennessee state line, linking major freight routes in the region.

The entire I-269 corridor is part of the overall 1,600-mile long I-69 corridor that will eventually connect Canada to Mexico through the US. "Not only is Mississippi helping complete this bi-state beltway around this major metropolitan area, but the finished roadway will spur development and economic growth throughout the state," said US Transportation Secretary Ray LaHood. "Projects like this boost the economy and create jobs while moving people and goods as safely and effectively as possible." "This project will help move freight across Mississippi, enhance regional and national transportation networks, and connect communities," said Federal Highway Administrator Victor Mendez.

Related Content

  • Highways expansion project in Los Angeles area
    August 9, 2017
    A loan worth US$629 million will help pay for a highway upgrade for the I-405 route in Orange County, California. The stretch of I-405 connects with Costa Mesa, on the southern side of Los Angeles. The federal loan is being provided by the US Department of Transportation to the Orange County Transportation Authority (OCTA). The work is to upgrade a 22.4km stretch of I-405 between its junction with the I-605 Interstate, close to Rossmoor, and the SR 73 route at Costa Mesa, which connects with the nearby John
  • A first for the Netherlands with 100% RAP
    March 9, 2016
    Arizona Chemical’s bio-additive allows 100% recycled asphalt for entire road structure The city of Rotterdam has used an asphalt mix with 100% RAP in all three of its layers, a first for the Netherlands. The road in question is a bike lane, so it won’t be expecting too much of a pounding, but it’s an important step forward for the city’s politicians, asphalt supplier KWS and additive specialist Arizona Chemical. Arizona Chemical designed its SYLVAROAD RP1000 performance additive with the express aim o
  • Paraguay highway project tender process
    April 5, 2016
    Paraguay is commencing the tender process for the first section of the bi-oceanic corridor project. The plans have been announced by the Public Works and Communications Ministry. Work on the first section of the bi-oceanic corridor will be carried out between Carmelo Peralta and Loma Plata. The project is expected to cost in the region of US$315 million. The tender process for the second section of the corridor will commence in late 2016. This section of the route will run between Mariscal Estigarribia and
  • Talks continue for 2025 Gordie Howe opening
    January 18, 2023
    The tolled six-lane cable-stayed bridge over the Detroit River will connect the city of Windsor in the Canadian province of Ontario with Detroit in the neighbouring US state of Michigan.