Skip to main content

Key project for US commences

In the US work is now commencing on the key I-269 highway upgrade at Byhalia in the state of Mississippi. The new US$19.5 million section now under construction will complete the beltway around nearby Memphis, Tennessee.
February 14, 2012 Read time: 2 mins
RSSIn the US work is now commencing on the key I-269 highway upgrade at Byhalia in the state of Mississippi. The new US$19.5 million section now under construction will complete the beltway around nearby Memphis, Tennessee. When completed in 2014, this first phase of Mississippi's portion of I-269 will provide 5km of new roadway and bridge construction from State Route 302 to the Mississippi/Tennessee state line. The new link is expected to reduce congestion and move traffic and freight throughout the state as well as in and around nearby Memphis. This will be the first of four phases of highway construction in Mississippi however. The completed I-269 loop in Mississippi is expected to cost $668.7 million and will provide a 40km direct connection from the existing I-55/I-69 Interchange to the Tennessee state line, linking major freight routes in the region.

The entire I-269 corridor is part of the overall 1,600-mile long I-69 corridor that will eventually connect Canada to Mexico through the US. "Not only is Mississippi helping complete this bi-state beltway around this major metropolitan area, but the finished roadway will spur development and economic growth throughout the state," said US Transportation Secretary Ray LaHood. "Projects like this boost the economy and create jobs while moving people and goods as safely and effectively as possible." "This project will help move freight across Mississippi, enhance regional and national transportation networks, and connect communities," said Federal Highway Administrator Victor Mendez.

Related Content

  • High-tech, high places: 3M in US and MetService in New Zealand
    August 1, 2017
    The US state of Michigan sets up a high-tech test road while New Zealand’s transport officials buy in some high-tech weather forecasting. The road safety division of 3M will provide the US state of Michigan with lane markings and retroreflective signs for a connected vehicle technologies trial along the I-75 highway. Around 5km of the Interstate 75 work zone in Oakland County will be transformed over the next four months to improve safety for drivers and test advanced vehicle-to-infrastructure technologie
  • Conference highlights Mexico's highway investment
    February 27, 2012
    At the recent PIARC World Road Conference in Mexico City the country’s president, Felipe Calderon, made a keynote opening address. Calderon emphasised that infrastructure investment and expansion forms a crucial component in the country’s future economy and as such, has been a priority for his administration. Calderon took office in 2006 and by the end of this year Mexico will have built or rebuilt some 19,000km of roads and highways in the country. Due to its proximity to the US, Mexico is highly dependen
  • Mexico cutting motorway budget
    February 23, 2015
    Mexico is cutting its planned motorway construction budget. The country's Secretariat for Transport and Communications (SCT) has said the budget will be cut by US$268.8 million, a reduction of 17% from the figure planned originally. The 130 different projects that were to have been carried out under the original budget will still be built, but a number may be delayed. Road construction has been a key priority for this government in Mexico. In all some 46 new motorways will have been constructed by the prese
  • Kenya’s elevated highway gets a green light from the World Bank
    August 18, 2016
    The World Bank agreed to finance construction of Kenya’s first double deck highway, according to media reports. Construction is set to begin by the end of this year on the toll road to link Jomo Kenyatta International Airport and the Nairobi-Nakuru highway. Peter Mundinia the director-general of the Kenya National Highways Authority, explained that construction of the all-elevated dual carriageway will be in three phases. The first will begin with 6.5km running from the airport to Likoni Road and the