Skip to main content

Key link upgrade for Washington State

The US state of Washington's Department of Transportation (WSDOT) has awarded a major contract to rebuild and upgrade State Route 520 in King County.
February 23, 2012 Read time: 2 mins
Traffic on the existing SR 250 floating bridge
The 914 Washington State Department of Transportation (WSDOT) has awarded a major contract to rebuild and upgrade State Route 520 in King County.
The US$306 million projects will be handled by Eastside Corridor Constructors (ECC), a joint venture comprising 1007 Granite Construction with a 60% stake in the contract and 984 PCL Construction Services with a 40% share of the work.
The aim of the project is to widen and rebuild a number of sections of the existing highway between the Lake Washington Floating Bridge and the Interstate 405 connector. The work will also include building three landscaped bridges over SR 520, adding high occupancy vehicle (HOV) lanes, bus rapid transit stations, direct access ramps to surface streets, and major retaining walls, sound walls, lighting, utility relocations and landscaping. In addition, the Lake Washington Floating Bridge will be converted to an electronic toll road with toll collection beginning in the spring of 2011. The toll revenue from the bridge will be used to part fund the construction costs as well as to help pay for operation and maintenance of SR 520 and any subsequent improvement. In addition, ECC will also carry out environmental work to improve drainage and prevent contaminated water run-off, upgrade fish habitats, and provide open drainage systems for fish passages. The construction work is expected to be complete by February 2014.

Related Content

  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.
  • Utah key highway connection project
    February 23, 2018
    Work is now complete for the second phase of the Mountain View Corridor project in the US state of Utah. The 4km greenfield roadway runs from 5400 South to 4100 South in West Valley City. The project was designed and built jointly by Michael Baker International, Ralph L Wadsworth and Staker Parsons. Phase two of the Mountain View Corridor project included 14 mainline bridges, as well as seven pedestrian bridges and intersection reconstruction, and vital safety improvements to accommodate growth in Salt Lake
  • Texas highway contract awarded to Ferrovial
    April 16, 2021
    A key Texas highway contract has been awarded to Ferrovial and its subsidiary.
  • German highway project awarded
    January 25, 2021
    A key German highway project has been awarded.