Skip to main content

Key link upgrade for Washington State

The US state of Washington's Department of Transportation (WSDOT) has awarded a major contract to rebuild and upgrade State Route 520 in King County.
February 23, 2012 Read time: 2 mins
Traffic on the existing SR 250 floating bridge
The 914 Washington State Department of Transportation (WSDOT) has awarded a major contract to rebuild and upgrade State Route 520 in King County.
The US$306 million projects will be handled by Eastside Corridor Constructors (ECC), a joint venture comprising 1007 Granite Construction with a 60% stake in the contract and 984 PCL Construction Services with a 40% share of the work.
The aim of the project is to widen and rebuild a number of sections of the existing highway between the Lake Washington Floating Bridge and the Interstate 405 connector. The work will also include building three landscaped bridges over SR 520, adding high occupancy vehicle (HOV) lanes, bus rapid transit stations, direct access ramps to surface streets, and major retaining walls, sound walls, lighting, utility relocations and landscaping. In addition, the Lake Washington Floating Bridge will be converted to an electronic toll road with toll collection beginning in the spring of 2011. The toll revenue from the bridge will be used to part fund the construction costs as well as to help pay for operation and maintenance of SR 520 and any subsequent improvement. In addition, ECC will also carry out environmental work to improve drainage and prevent contaminated water run-off, upgrade fish habitats, and provide open drainage systems for fish passages. The construction work is expected to be complete by February 2014.

Related Content

  • Weigh in motion and ANPR techology aid highway protection
    April 10, 2012
    Weigh-in-motion technology manufacturers have been involved in a number of significant highways tolling projects across the world in recent months, while others are looking to become involved in major new initiatives. Guy Woodford reports. The continuing global economic crisis did not prevent UK-based TDC Traffic Systems from recently securing the prized US$2.84million (€2.14million) contract to supply 20 high speed weigh-in-motion (WIM) systems for overweight pre-selection and enforcement in Saudi Arabia
  • Virginia project for Parsons
    June 28, 2016
    Parsons has won a deal to design and installation of the nation’s first all-lane, dynamic-priced tolling system on a 16km segment of Interstate 66 in Virginia. This stretch of highway runs from Interstate 495, the Capital Beltway, to US Route 29 in Rosslyn, Virginia. Dynamic tolling, able to adjust toll pricing to demand, will operate in the peak travel direction during weekday rush hours. This will help lower traffic congestion into and out of US capital Washington, DC.
  • Lane Construction to carry out Florida highway deal
    November 24, 2017
    Lane Construction Corporation will carry out construction work worth US$134.6 million on a stretch of highway in Florida. This 21km section of the new Suncoast Parkway 2 will run to the north of Tampa, along Florida’s western coast. The route is intended to be a major transport corridor for the state and will feature four lanes. Called SR 589, the tolled route will run from South of SR 700 (US 98) to SR 44 in Hernando and Citrus Counties. Lane Construction is building the second of two sections of the Sunco
  • Virginia I-95 highway section opening
    August 22, 2023
    A Virginia I-95 highway stretch is opening.