Skip to main content

Istanbul’s new tunnel connection opens

Istanbul’s new Eurasia Tunnel has been opened for traffic, connecting the Asian and European side of the Bosporus strait. The new link will help reduce congestion in Istanbul and should cut travel times to just 15 minutes for drivers using the link. The tunnel runs from Kazlıçeşme on the European side to Göztepe on the Asian side of the Bosporus strait. The new route is 14.5km long, with a 5.4km tunnel stretch lying up to 106m below the Bosporus Strait and features two decks for vehicles and it is expect
December 22, 2016 Read time: 2 mins
Istanbul’s new Eurasia Tunnel has been opened for traffic, connecting the Asian and European side of the Bosporus strait. The new link will help reduce congestion in Istanbul and should cut travel times to just 15 minutes for drivers using the link. The tunnel runs from Kazlıçeşme on the European side to Göztepe on the Asian side of the Bosporus strait.

The new route is 14.5km long, with a 5.4km tunnel stretch lying up to 106m below the Bosporus Strait and features two decks for vehicles and it is expected to carry 100,000 vehicles/day. Construction of the link commenced in 2011 and the project has cost around US$1.25 billion. As the Istanbul area lies within an earthquake zone, the tunnel has been designed and built to cope with shocks measuring up to 7.5 on the Richter scale.

Sophisticated traffic control and monitoring technology is built into the new link, along with the availability of mobile data for drivers while tolling is by modern automatic systems. Other modern safety systems include the latest lighting, ventilation, CCTV, event monitoring and fire alert and control technology as well as emergency evacuation links and safety zones located every 600m. The link is being managed by the Eurasia Tunnel Operation Construction and Investment (ATAŞ), which won a package to design, construct and operate the tunnel for 24 years and five months.

Related Content

  • Traffic control solution manufacturers win key project works
    September 26, 2013
    Traffic control system manufacturers have recently supplied some of their cutting-edge technology to major projects in Europe. Meanwhile, in southern Asia, another leading firm in the sector is helping reduce chronic traffic congestion in Indonesia’s capital, Jakarta. Guy Woodford reports Solutions supplied by Siemens Mobility & Logistics (M&L) are helping the Rijkswaterstaat improve traffic conditions at the Coentunnel in Amsterdam, one of the most heavily used traffic arteries in the Netherlands, used
  • New Zealand’s Waterview project is moving closer to completion
    December 13, 2016
    New Zealand’s biggest road project is less than a year away from completion, and a lot of progress has been made since World Highways last looked at the project two years ago - Mary Searle Bell reports New Zealand’s Waterview project is moving closer to completion and will be the largest road project in the country. The NZ$2 billion Western Ring Route will see the creation of an alternative motorway to State Highway 1, which runs through the centre of Auckland. The 47km-long motorway will allow a large p
  • Copy of New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne