Skip to main content

Istanbul’s new tunnel connection opens

Istanbul’s new Eurasia Tunnel has been opened for traffic, connecting the Asian and European side of the Bosporus strait. The new link will help reduce congestion in Istanbul and should cut travel times to just 15 minutes for drivers using the link. The tunnel runs from Kazlıçeşme on the European side to Göztepe on the Asian side of the Bosporus strait. The new route is 14.5km long, with a 5.4km tunnel stretch lying up to 106m below the Bosporus Strait and features two decks for vehicles and it is expect
December 22, 2016 Read time: 2 mins
Istanbul’s new Eurasia Tunnel has been opened for traffic, connecting the Asian and European side of the Bosporus strait. The new link will help reduce congestion in Istanbul and should cut travel times to just 15 minutes for drivers using the link. The tunnel runs from Kazlıçeşme on the European side to Göztepe on the Asian side of the Bosporus strait.

The new route is 14.5km long, with a 5.4km tunnel stretch lying up to 106m below the Bosporus Strait and features two decks for vehicles and it is expected to carry 100,000 vehicles/day. Construction of the link commenced in 2011 and the project has cost around US$1.25 billion. As the Istanbul area lies within an earthquake zone, the tunnel has been designed and built to cope with shocks measuring up to 7.5 on the Richter scale.

Sophisticated traffic control and monitoring technology is built into the new link, along with the availability of mobile data for drivers while tolling is by modern automatic systems. Other modern safety systems include the latest lighting, ventilation, CCTV, event monitoring and fire alert and control technology as well as emergency evacuation links and safety zones located every 600m. The link is being managed by the Eurasia Tunnel Operation Construction and Investment (ATAŞ), which won a package to design, construct and operate the tunnel for 24 years and five months.

Related Content

  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v
  • New tunnel Acapulco Bay in Mexico
    May 25, 2016
    Acapulco is to benefit from a new tunnel route to cut congestion. A new road tunnel close to Acapulco Bay will help cut journey times for drivers in this part of Mexico. Both tourists and locals in Acapulco Bay currently experience long journey times at present, with a key problem being congestion on the 12km route from Juan N Alvarez International Airport to the Acapulco Bay beaches. During peak traffic times the journey along the scenic, winding road around the tip of the Cumbres de Llano Largo Mountain t
  • Bentley’s Be Inspired Awards highlight innovation in software use
    January 6, 2015
    Innovation, from design to on-site execution, is alive and well, thanks to a good helping of software application. David Arminas reports from software developer Bentley’s annual global conference, held this year in London Successful project delivery is increasingly about hard men and women using software to get the job done and this year’s global conference in London by US-based software developer Bentley highlighted some innovative - and startling - examples. As usual, the Year in Infrastructure 2014
  • Crash cushion design
    February 13, 2012
    There are key differences in crash cushion design and quality for the United States and European markets. Developments in barrier technologies have followed the varying demands of specific markets, resulting in manufacturers offering different solutions for US and European needs.