Skip to main content

Fierce competition for Toronto 407 ETR highway expansion contract

ACS of Spain and Ferrovial are competing for the contract to construct and exploit the second phase of expanding the 407 ETR highway in Toronto, Canada – one of the world’s biggest toll highways. Ferrovial has been managing the 407 ETR highway since 1999 and secured the first phase of its expansion. Currently, ACS and Ferrovial lead two of the three groups invited to present bids for the second phase of the expansion. The third group is headed by Canada's SNC Lavalin, which is Ferrovial's current partner i
April 24, 2014 Read time: 2 mins
917 ACS of Spain and 2717 Ferrovial are competing for the contract to construct and exploit the second phase of expanding the 407 ETR highway in Toronto, Canada – one of the world’s biggest toll highways.

Ferrovial has been managing the 407 ETR highway since 1999 and secured the first phase of its expansion. Currently, ACS and Ferrovial lead two of the three groups invited to present bids for the second phase of the expansion. The third group is headed by Canada's 2482 SNC Lavalin, which is Ferrovial's current partner in the management of the current stretch of the highway. The groups are being given six months to present their proposals. The second phase highway expansion project consists of the construction, financing and operation of another 23km of the 407 ETR highway to the East - a new stretch that will link Clarintong and Oshawa, which will also have four lanes each way.

The first 407 ETR highway expansion phase will add 22km to the overall route, which currently runs for 108km, with the new highway stretch forecast to start operating in late-2015. The second 407 ETR highway expansion stretch will be brought online in stages with one stretch starting operation in 2017, and the rest in 2020.

For more information on companies in this article

Related Content

  • Canada: work officially starts on Montreal’s Champlain Bridge
    June 25, 2015
    Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion. The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019. SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-
  • COWI wins Massey Tunnel design contract
    February 18, 2022
    COWI will develop an eight-lane immersed tunnel for the George Massey Crossing Project near Vancouver, Canada.
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.
  • Parsons wins 407 Transitway contract around the Toronto area in Canada
    August 21, 2015
    Parsons has been selected by the Canadian province of Ontario to provide environmental assessment planning and preliminary design for the next section of the 407 Transitway. Work will include 23km of bus rapid transit lanes, from west of Hurontario Street to east of Highway 400, as well as 11 transit stations, all around the provincial capital Toronto area. The project is part of the 150km cross-regional rapid transit corridor planned to parallel Highway 407 Express Toll Route freeway, a 107km control