Skip to main content

Colombia dual carriageways under construction

Colombia is currently working on major highway projects that will improve transport infrastructure in the country and form part of its 4G programme. The US$616.5 million Rumichaca-Pasto dual carriageway in Narino department will improve Colombia’s transport connections with neighbouring Ecuador, cutting journey times from two hours at present to just one hour. The project is being handled by a consortium, Consorcio SAC 4G and involves improving an 80km road section and building additional lanes for the 74km
October 10, 2016 Read time: 2 mins
Colombia is currently working on major highway projects that will improve transport infrastructure in the country and form part of its 4G programme. The US$616.5 million Rumichaca-Pasto dual carriageway in Narino department will improve Colombia’s transport connections with neighbouring Ecuador, cutting journey times from two hours at present to just one hour. The project is being handled by a consortium, Consorcio SAC 4G and involves improving an 80km road section and building additional lanes for the 74km stretch between Ipiales and Pasto. The work also includes building 3.6km of bridges and 2.4km of tunnels as well as six interchanges. Another aspect of the project will be the installation of sophisticated traffic management technology to monitor vehicle flow along the route. The new route will improve transport connections for Rumichaca, Pupiales, Gualmatán, Ipiales, Iles, El Pedragal, Funes and Pasto.

Construction is also starting for the Pacifico I highway road in Antioquia department. Another project being prioritised by the Colombian Government is the construction of the Rumichaca-Variante Sur de Ipiales highway, which form part of the national Vias para la Equidad (Roads for Equality) programme. Design work for the Conexion Valle-Altillanura, Palmira-La Uribe-Villavicencio and Conexion Choco-Valle routes, are also now being carried out.

Related Content

  • Third phase for Colombia’s complex PPP project
    September 15, 2017
    Work is underway on the third stage of Colombia’s Bogota-Villavicencio road project. This 24km project is being carried out under the PPP model by the concession holder, Concesionaria Vial Andina (Coviandina). The project is complex and includes the construction of seven tunnels in all, which have a total length of 10.7km, as well as 21 bridges and overpasses measuring 3.8km in all. Coviandina has bored around 930m of the total tunnel length at present.
  • Building Egypt's world class Desert Highway
    February 9, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports
  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong