Skip to main content

Chile’s growing traffic volumes are a growing problem

Chile’s growing traffic volumes are creating a growing problem for traffic management. In many urban areas in Chile congestion is increasing at a rapid rate. Capital Santiago is afflicted particularly badly in this respect. Traffic jams are now frequent on the main interurban routes in Chile, especially on toll roads, and the number of vehicles travelling on these roads continues to rise month after month, leading to major concern.
May 9, 2016 Read time: 2 mins
Chile’s growing traffic volumes are creating a growing problem for traffic management. In many urban areas in Chile congestion is increasing at a rapid rate. Capital Santiago is afflicted particularly badly in this respect. Traffic jams are now frequent on the main interurban routes in Chile, especially on toll roads, and the number of vehicles travelling on these roads continues to rise month after month, leading to major concern. Between January and February of 2016, the traffic on Route 5 of the Santiago-Talca road rose by at least 60% compared to the same period in 2011. The road operator Intervial Chile - linked to the Colombian company ISA - has stated that its monthly revenue for February 2016 totalled US$16.21 million, representing a rise of 6.3% compared to January 2016 and a rise of 15.5% compared to February 2015. Moreover, The Angostura toll road constituted the highest contribution with 48.8%. On 5 May 2016 the Chilean Chamber of Construction (CChC) announced that the country is falling behind other countries such as Spain and New Zealand in terms of infrastructure, with a collection of roads to surpass their capacity level within the next few years and three Santiago routes to exceed their limit before 2025. Construction is currently underway on Route 5 to add a third lane to the Angostura section between the Maipo Bridge and the Rancagua Bypass (between the 51st and 58th kilometre points), and is expected to be completed in January 2017. Intervial and the Ministry of Public Works (MOP) are in negotiations to start construction on another lane. Other possible plans include an extra lane to the section between Angostura and the Rancagua Bypass (11km in length), and an extra lane between the Maipo Bridge and the Route 5 South Access point (21km in length).

Related Content

  • French road deaths cause for concern
    August 29, 2017
    France has achieved major results in reducing road deaths in the last 10 years but now appears to have hit a barrier with regard to better road safety. The figures for road deaths in July 2017 were better than for 2016. There were 346 fatalities in July 2017 compared with 356 road deaths in July 2016. However there were 5,121 crashes in July 2017, an increase of 41 from July 2016. At the same time there were 7,204 injuries in July 2017, an increase of 226 from July 2016, although serious injuries requiring
  • Wacker Neuson sees profits rise
    March 30, 2022
    Wacker Neuson is seeing its profits rise.
  • Wacker Neuson remains on growth path in Q3
    November 14, 2014
    Wacker Neuson Group reported a significant rise in revenue and profit for the third quarter of 2014 with especially high performance in the Americas and Asia-Pacific. Sales of light and compact equipment were driven primarily by an upturn in business in North America where the Munich-based group is planning its first production line for compact equipment. All regions contributed to revenue growth in the third quarter of 2014. Europe reported a 14% increase while the Americas and Asia-Pacific both saw reve
  • A third of Mecklenburg Vorpommern state roads in poor condition
    May 19, 2016
    Only 44% of roads in the northeastern German state of Mecklenburg Vorpommern are in good or very good condition, according to a transport infrastructure report presented to the German parliament. Also, a third are in poor or very poor condition. The state - the least densely populated in all Germany - performed well compared to other states, according to German media reports. But there are more than 600km where the damage is so bad that it must be repaired as soon as possible or at least be closely m