Skip to main content

Key upgrades to roads in Algeria’s Ouargla Province

A series of road and highway upgrades are being carried out in Algeria’s Ouargla Province. These will help boost safety and include new lighting and installing a 10km concrete median divider on the RN-3 route. A new 10km bypass is being built in the south-west of Ouargla city, which is due for completion at the end of October 2015. This new connection will improve access to the city’s suburbs, as well as cutting travel time between Ouargla, Hassi Messaoud and Ghardaïa. Ouargla has a road network spanning 2,
August 26, 2014 Read time: 1 min

A series of road and highway upgrades are being carried out in Algeria’s Ouargla Province. These will help boost safety and include new lighting and installing a 10km concrete median divider on the RN-3 route. A new 10km bypass is being built in the south-west of Ouargla city, which is due for completion at the end of October 2015. This new connection will improve access to the city’s suburbs, as well as cutting travel time between Ouargla, Hassi Messaoud and Ghardaïa. Ouargla has a road network spanning 2,083km, including 1,484km of national highways.

Related Content

  • Weigh in motion and ANPR techology aid highway protection
    April 10, 2012
    Weigh-in-motion technology manufacturers have been involved in a number of significant highways tolling projects across the world in recent months, while others are looking to become involved in major new initiatives. Guy Woodford reports. The continuing global economic crisis did not prevent UK-based TDC Traffic Systems from recently securing the prized US$2.84million (€2.14million) contract to supply 20 high speed weigh-in-motion (WIM) systems for overweight pre-selection and enforcement in Saudi Arabia
  • Signify lights up Gran Canaria
    January 8, 2021
    The island chose Philips DigiStreet LEDs with Interact City connected lighting software.
  • Concrete pumps speed busy road upgrade
    February 14, 2012
    WORK ON a major upgrade at a busy German road junction is expected to be completed by the end of 2011. To assist in the project, two Putzmeister large-boom concrete pumps, an M 58-5 from Berger Beton and an M 62-6 from BFM Betonförderdienst in Munich, arrived at the Neufahrn motorway junction, north of the city. The junction, when viewed from above, looks like a flatly pressed four-leaf clover, and can no longer cope with traffic volumes. Two national motorways, the A 9 and the A 92, intersect at the
  • Concrete pumps speed busy road upgrade
    May 3, 2012
    Work on a major upgrade at a busy German road junction is expected to be completed by the end of 2011. To assist in the project, two Putzmeister large-boom concrete pumps, an M 58-5 from Berger Beton and an M 62-6 from BFM Betonförderdienst in Munich, arrived at the Neufahrn motorway junction, north of the city.