Skip to main content

Key upgrades to roads in Algeria’s Ouargla Province

A series of road and highway upgrades are being carried out in Algeria’s Ouargla Province. These will help boost safety and include new lighting and installing a 10km concrete median divider on the RN-3 route. A new 10km bypass is being built in the south-west of Ouargla city, which is due for completion at the end of October 2015. This new connection will improve access to the city’s suburbs, as well as cutting travel time between Ouargla, Hassi Messaoud and Ghardaïa. Ouargla has a road network spanning 2,
August 26, 2014 Read time: 1 min

A series of road and highway upgrades are being carried out in Algeria’s Ouargla Province. These will help boost safety and include new lighting and installing a 10km concrete median divider on the RN-3 route. A new 10km bypass is being built in the south-west of Ouargla city, which is due for completion at the end of October 2015. This new connection will improve access to the city’s suburbs, as well as cutting travel time between Ouargla, Hassi Messaoud and Ghardaïa. Ouargla has a road network spanning 2,083km, including 1,484km of national highways.

Related Content

  • New Zealand tunnel project
    May 23, 2012
    New Zealand’s Waterview tunnel project in Auckland will provide a key link in, boosting capacity and safety while reducing congestion and journey times. A consortium will handle the work for the Waterview Connection road, in a deal worth $1.15 billion (NZ$1.4 billion). The Well Connected consortium includes local company Fletcher Construction as well as other New Zealand and overseas firms. The deal is of note as it will be New Zealand’s single largest highway project and work is due to commence in November
  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained
  • Rising to the challenge
    July 18, 2012
    Visualise today's concept of a major commercial traffic corridor in the western United States. A roadway responsible for delivering goods to Arizona, Nevada and Utah, that also connects Mexico to the United States to Canada through the North American Free Trade Agreement (NAFTA). What springs to mind? A multi-lane highway carrying thousands of vehicles a day past cities at speeds up to 113km/hour, while egress ramps make sure vehicles get safely to city streets and their final destination. This is not the c
  • Sydney’s new tunnel link opening
    July 10, 2020
    Sydney’s new tunnel link is now opening to traffic.