Skip to main content

Chile approves construction of the Agua Negra project through the Andes

Plans for a cross-continent upgraded road were recently boosted when Chile’s senate approved construction of its share of a major US$1.6 billion tunnel in the Andes Mountains. The Chilean approval comes after the Argentinian government gave the nod in March for construction on its section of the Agua Negra project. A tender for specific design work could be put out by September, according to the Argentinian newspaper Diario de Cuyo. The approvals resolve a number of bilateral issues including taxation
August 13, 2015 Read time: 3 mins
Plans for a cross-continent upgraded road were recently boosted when Chile’s senate approved construction of its share of a major US$1.6 billion tunnel in the Andes Mountains.

The Chilean approval comes after the Argentinian government gave the nod in March for construction on its section of the Agua Negra project. A tender for specific design work could be put out by September, according to the Argentinian newspaper Diario de Cuyo.

The approvals resolve a number of bilateral issues including taxation, work laws, migration and customs. There are 18 consortia interested in the initiative, according to the newspaper.

A road across the Agua Negra Pass at 4,780m connects the provinces of San Juan in Argentina and the region of Coquimbo, Chile. But the sand and gravel pass is often closed due to poor weather during winter months of May to October.

The project, part of the Bioceanic Central Corridor, would connect the Chilean port of Coquimbo on South America’s Pacific Ocean coast with the Atlantic port of Porto Alegre in Brazil. The tunnel itself would join the Argentine town of Lujan de Cuyo, located in the province of Mendoza, with Los Andes, in Chile’s Valparaiso region,

In April last year, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 17409 0 oLinkExternal World Highways reported Visit www.worldhighways.com website false /categories/road-highway-structures/features/agua-negra-tunnel-between-chile-and-argentina/ false false%> on the latest thinking behind the project.

The pass can be accessed from the Argentine side via National Highway No 150 from the province of La Rioja, which runs for 390km. From the Chilean side, the pass can be accessed by Highway 41 CH which begins in the city of La Serena and is paved up to the customs house.

The highway project consists of two parallel tunnels to carry two traffic lanes. The tunnels, almost 14km long, would have a maximum width of 11m and a maximum incline limited to 4%. Maximum speed would be 100km/h with a maximum cant, or camber, of 2.5%.

The only totally paved road between Chile and Argentina is the Cristo Redentor Pass, also called the Paso Internacional Los Libertadores. It links the cities of Mendoza, in Argentina, to Santiago de Chile and Valparaiso, through the 3.04km International Cristo Redentor Tunnel.

The tunnel, at 3,185m above sea level, was opened in 1980.Two out of every three tonnes of freight that move overland across the southern Andes have to use this route. But the pass is closed for up to 60 days during the winter.

Chile and Argentina are also planning the Aconcagua Bi-Oceanic railway project, a 52km tunnel over the Cristo Redentor Pass. The route would be bi-modal, with train cars having roll-on roll-off truck access for the journey.

Related Content

  • Work for Argentina’s famous highway
    May 20, 2025
    Work is underway for a key stretch of Argentina’s famous Route 40 highway.
  • Chile-Argentina tunnel project to take nine years
    May 3, 2017
    Construction work for the Agua Negra tunnel connecting Argentina with Chile is expected to take nine years to complete. The actual construction work will commence in 2019, although considerable activity will be required beforehand. Building the tunnel is expected to cost in the orders of US$1.5 billion. Much of the financing for the project is being provided by the Inter-American Development Bank (IADB). So far the IADB has given $20 million to Argentina and a further $20 million to Chile to pay for the nec
  • Cost increases for major Chilean highway project
    November 15, 2013
    The cost of Chile’s Vespucio Oriente highway project is increasing, while its completion also looks set to be delayed. A 13% budget increase is now required due to additional costs from a number of factors such as urban landscaping, according to Business News Americas. The Américo Vespucio Oriente (AVO) expressway is being built in Chilean capital Santiago and was originally expected to cost in the region of US$940 million. However Chile’s Public Works Ministry, MOP, has said that the route will now cost so
  • Road works underway in Argentina
    May 25, 2021
    Road works are now underway in Argentina.