Skip to main content

Xylem pumps

Among the many suppliers working on Pennsylvania’s rapid bridge replacement project is pump specialist Xylem which has sold and rented a variety of pumps to lead contractor Walsh/Granite and some of the 45 sub-contractors also carrying out the works. “The scale of the project – to complete over 550 bridge upgrades within an ambitious timeline – demanded a reliable dewatering partner who could provide a broad range of dewatering solutions to meet diverse, often complex, pumping requirements,” said Stan Rock
December 14, 2017 Read time: 3 mins
Among the many suppliers working on Pennsylvania’s rapid bridge replacement project is pump specialist 3936 Xylem which has sold and rented a variety of pumps to lead contractor Walsh/Granite and some of the 45 sub-contractors also carrying out the works.


“The scale of the project – to complete over 550 bridge upgrades within an ambitious timeline – demanded a reliable dewatering partner who could provide a broad range of dewatering solutions to meet diverse, often complex, pumping requirements,” said Stan Rockovich, Xylem’s project lead for the Pennsylvania Bridge project.

According to Rockovich, Xylem and Walsh had already established a good relationship, having worked together on numerous projects around the US. This led to Xylem’s deployment across programme.

“For the bridge replacement project in Pennsylvania, pumps are required to divert streams to facilitate bridge construction,” explained Rockovich. “Factors such as changing weather and storm events combined with space limitations make managing these diversions more challenging”.

With a fleet of 20,000 assets, Xylem has been able to meet the variety of challenges the 558-bridge programme has created. Pumping requirements to date have included Godwin diesel-powered centrifugal pumps, suitable for applications where electricity is not readily available; 3939 Flygt submersible electric pumps where a power supply is available; and hydraulic submersible pumps with power pack systems in a variety of sizes, to handle different flow rates.  

Also at Walsh’s disposal is Xylem’s Godwin Field Smart Technology (FST) - a remote control and monitoring system which provides crucial pump operating data from pumps situated in remote locations, which can reduce or eliminate the need to have people on site. The contractor can monitor and control the operation of a pump remotely, checking that it is performing as required.

In Pennsylvania, contractors have often needed pumps at short notice, said Rockovich. “With a project of this scale, pumps are often required on very short notice and it is crucial that requests can be met without delay to avoid hampering construction timelines. Our broad footprint means that we’ve been able to have pumps delivered to the job site and ready for use within a matter of hours.”

As well as providing dewatering solutions, Xylem teams also deliver on-site training to the contractors’ road mechanics and operations managers, with ‘lunch and learn’ sessions, said Rockovich, designed to help contractor teams to trouble-shoot in the event that minor maintenance is required on pumps during operation.

For more information on companies in this article

Related Content

  • Giatec promises Smart Concrete
    April 27, 2018
    Giatec’s Smart Concrete concept allows ready mix concrete suppliers to offer optimised mixes to their customers – and to charge more for them. Giatec, which makes concrete sensors and associated software and apps, works with the concrete producers to calibrate their mixes. The concrete company then supplies Giatec’s maturity monitoring sensors as part of the concrete package. “The ready mix suppliers get information straight away so that they can adjust their mixes if necessary,” says Giatec business
  • Yeti more autonomous snow-clearing by Semcon
    January 9, 2019
    Semcon, a Swedish applied automation company, said it has started an on-site project to clear snow from runway landing lights using autonomous vehicles. Most often the time-consuming job of clearing snow around landing lights has to be done manually because of the intricate maneouvres needed to avoid damaging the lighting systems. The trial project, which started this month, will be demonstrated in about a year’s time at Örnsköldsvik Airport, around 525km north of the Swedish capital Stockholm, accord
  • Upgrading a busy A road link in the UK
    July 4, 2018
    The upgrade to the UK’s busy A14 route will address a significant traffic bottleneck - Mike Woof writes The UK is suffering badly from traffic congestion, a problem that is particularly severe in and around its major cities. Lack of investment in road construction over many years has resulted in a major backlog of work, while the country has seen growing vehicle numbers. To make matters worse, there have been few additions to the major road network since the late 1980s and early 1990s. And the combinatio
  • Digital transformation is delivering digital adoption
    August 15, 2023
    Digital transformation is key for transportation agencies and their partners to do their jobs better and faster. One way to do this is through digital delivery using digital models, data, and supporting field tools for roadway design, structures design, and construction, say the tech experts at Bentley Systems.