Skip to main content

Xylem pumps

Among the many suppliers working on Pennsylvania’s rapid bridge replacement project is pump specialist Xylem which has sold and rented a variety of pumps to lead contractor Walsh/Granite and some of the 45 sub-contractors also carrying out the works. “The scale of the project – to complete over 550 bridge upgrades within an ambitious timeline – demanded a reliable dewatering partner who could provide a broad range of dewatering solutions to meet diverse, often complex, pumping requirements,” said Stan Rock
December 14, 2017 Read time: 3 mins
Among the many suppliers working on Pennsylvania’s rapid bridge replacement project is pump specialist 3936 Xylem which has sold and rented a variety of pumps to lead contractor Walsh/Granite and some of the 45 sub-contractors also carrying out the works.


“The scale of the project – to complete over 550 bridge upgrades within an ambitious timeline – demanded a reliable dewatering partner who could provide a broad range of dewatering solutions to meet diverse, often complex, pumping requirements,” said Stan Rockovich, Xylem’s project lead for the Pennsylvania Bridge project.

According to Rockovich, Xylem and Walsh had already established a good relationship, having worked together on numerous projects around the US. This led to Xylem’s deployment across programme.

“For the bridge replacement project in Pennsylvania, pumps are required to divert streams to facilitate bridge construction,” explained Rockovich. “Factors such as changing weather and storm events combined with space limitations make managing these diversions more challenging”.

With a fleet of 20,000 assets, Xylem has been able to meet the variety of challenges the 558-bridge programme has created. Pumping requirements to date have included Godwin diesel-powered centrifugal pumps, suitable for applications where electricity is not readily available; 3939 Flygt submersible electric pumps where a power supply is available; and hydraulic submersible pumps with power pack systems in a variety of sizes, to handle different flow rates.  

Also at Walsh’s disposal is Xylem’s Godwin Field Smart Technology (FST) - a remote control and monitoring system which provides crucial pump operating data from pumps situated in remote locations, which can reduce or eliminate the need to have people on site. The contractor can monitor and control the operation of a pump remotely, checking that it is performing as required.

In Pennsylvania, contractors have often needed pumps at short notice, said Rockovich. “With a project of this scale, pumps are often required on very short notice and it is crucial that requests can be met without delay to avoid hampering construction timelines. Our broad footprint means that we’ve been able to have pumps delivered to the job site and ready for use within a matter of hours.”

As well as providing dewatering solutions, Xylem teams also deliver on-site training to the contractors’ road mechanics and operations managers, with ‘lunch and learn’ sessions, said Rockovich, designed to help contractor teams to trouble-shoot in the event that minor maintenance is required on pumps during operation.

For more information on companies in this article

Related Content

  • ACE/AECOM report: private sector and user-pay for English roads
    May 14, 2018
    It’s one minute to midnight for funding England’s roads, according to a timely new report, and the clock’s big hand is pointing to some form of user-pay solution, reports David Arminas Is there any way out of future user-pay funding for England’s highway infrastructure? The answer is a resounding ‘no’, according to the recently published report: Funding Roads for the Future. The brief 25-page document by the London-based Association for Consultancy and Engineering, ACE**, sums up the state of England’s ro
  • Elevated thinking
    July 30, 2019
    A Swiss-designed system for the diversion of traffic away from road maintenance crews could be revolutionary, reports David Arminas Switzerland will soon tender for companies to build and supply a mobile system for physically shifting traffic away from bridge and road maintenance crews. The federal highways agency - FEDRO - will be asking manufacturers of heavy equipment to submit bids starting this summer for the Astra Bridge system. The system will be two lanes wide and include ramp sections at e
  • New traffic solutions for the UK
    July 15, 2015
    Two major developments being introduced will help optimise traffic flow on routes carrying high volumes of vehicles/day. An installation of Flexicon’s flexible conduit will help keep the traffic flowing on one of the busiest sections of the M6 motorway through Birmingham by protecting power and data cabling for overhead gantries and CCTV cameras. On behalf of Highways England, who is implementing a hard shoulder running scheme between junctions 5 and 8, contractor’s Carillion is using the 63mm diameter L
  • Bridge of international accord from Russia-China
    May 29, 2018
    A new bridge project joining China and Russia is a sign of international accord between the two nations – Mike Woof writes A new bridge spanning what China calls the Heilongjiang River and which is known as the Amur River in Russia, is a clear sign of an important international accord between the two countries. Discussions over the bridge project were first started between China and Russia in the 1980s, with both nations seeing many changes in leadership since that time. But while the political discussion