Skip to main content

Xylem pumps

Among the many suppliers working on Pennsylvania’s rapid bridge replacement project is pump specialist Xylem which has sold and rented a variety of pumps to lead contractor Walsh/Granite and some of the 45 sub-contractors also carrying out the works. “The scale of the project – to complete over 550 bridge upgrades within an ambitious timeline – demanded a reliable dewatering partner who could provide a broad range of dewatering solutions to meet diverse, often complex, pumping requirements,” said Stan Rock
December 14, 2017 Read time: 3 mins
Among the many suppliers working on Pennsylvania’s rapid bridge replacement project is pump specialist 3936 Xylem which has sold and rented a variety of pumps to lead contractor Walsh/Granite and some of the 45 sub-contractors also carrying out the works.


“The scale of the project – to complete over 550 bridge upgrades within an ambitious timeline – demanded a reliable dewatering partner who could provide a broad range of dewatering solutions to meet diverse, often complex, pumping requirements,” said Stan Rockovich, Xylem’s project lead for the Pennsylvania Bridge project.

According to Rockovich, Xylem and Walsh had already established a good relationship, having worked together on numerous projects around the US. This led to Xylem’s deployment across programme.

“For the bridge replacement project in Pennsylvania, pumps are required to divert streams to facilitate bridge construction,” explained Rockovich. “Factors such as changing weather and storm events combined with space limitations make managing these diversions more challenging”.

With a fleet of 20,000 assets, Xylem has been able to meet the variety of challenges the 558-bridge programme has created. Pumping requirements to date have included Godwin diesel-powered centrifugal pumps, suitable for applications where electricity is not readily available; 3939 Flygt submersible electric pumps where a power supply is available; and hydraulic submersible pumps with power pack systems in a variety of sizes, to handle different flow rates.  

Also at Walsh’s disposal is Xylem’s Godwin Field Smart Technology (FST) - a remote control and monitoring system which provides crucial pump operating data from pumps situated in remote locations, which can reduce or eliminate the need to have people on site. The contractor can monitor and control the operation of a pump remotely, checking that it is performing as required.

In Pennsylvania, contractors have often needed pumps at short notice, said Rockovich. “With a project of this scale, pumps are often required on very short notice and it is crucial that requests can be met without delay to avoid hampering construction timelines. Our broad footprint means that we’ve been able to have pumps delivered to the job site and ready for use within a matter of hours.”

As well as providing dewatering solutions, Xylem teams also deliver on-site training to the contractors’ road mechanics and operations managers, with ‘lunch and learn’ sessions, said Rockovich, designed to help contractor teams to trouble-shoot in the event that minor maintenance is required on pumps during operation.

For more information on companies in this article

Related Content

  • Warm mix asphalt offers green solution
    September 4, 2019
    A new report from the UK highlights that utilising warm mix asphalt (WMA) can help cut CO2 emissions. The All-Party Parliamentary Group on Highways has issued a report highlighting how the use of WMA can reduce carbon emissions and improve efficiencies on highways projects. WMAs are manufactured and laid at lower temperatures than traditional asphalts, using less energy and delivering carbon savings without compromising performance. Their use can reduce CO2 emissions associated with asphalt production for
  • David Barwell suggests six steps for closing the UK funding gap
    January 11, 2019
    Six steps for closing the UK funding gap Plenty of private money is seeking UK investment opportunities. The government and the infrastructure sector in general must make projects more attractive, writes David Barwell* It is widely acknowledged that the UK faces mounting economic, environmental and social problems if the nation's infrastructure fails to meet present and future demands. Government estimates propose that almost €561 billion is required to bridge the infrastructure funding gap. As part o
  • Better maintenance is on the Horizon for UK’s Warrington Council
    May 15, 2018
    Good, readable analysis of road surfaces to ensure sufficient maintenance funding is an essential part of asset management. The technical side of ensuring a good road surface is integral to maintaining safe, superior highway infrastructure. But securing sufficient government funding for such work – repairs and new-build – based on the current road surface is also essential. To evaluate road conditions and structure for such a business case, one UK local council turned to software provider Yotta.
  • Beyond cost: forging a solutions-led partnership for highways carbon-saving
    December 30, 2024
    Changing highways procurement is increasingly focusing material specification to drive carbon savings as well as cost. A longstanding partnership between Huyton Asphalt and Tarmac is delivering new solutions for highways clients in the UK.