Skip to main content

Versatile test boreholing rig from Central Alliance

A new modular rig from Central Alliance is said to opens access to areas that would otherwise be difficult to reach with conventional equipment. The firm says it has designed and built an innovative modular rig for use on difficult access areas. The modular rig was constructed in-house by Central Alliance’s development department, and can complete all the operations possible with a tracked rig including Standard Penetration Tests (SPT) and Cone Penetration Tests (CPT) at 1m intervals, U38, U70, U100 and U
May 22, 2018 Read time: 2 mins
The versatile borehole test rig from central Alliance can be used in difficult to access areas
A new modular rig from Central Alliance is said to opens access to areas that would otherwise be difficult to reach with conventional equipment. The firm says it has designed and built an innovative modular rig for use on difficult access areas.


The modular rig was constructed in-house by 8653 Central Alliance’s development department, and can complete all the operations possible with a tracked rig including Standard Penetration Tests (SPT) and Cone Penetration Tests (CPT) at 1m intervals, U38, U70, U100 and U100T sampling, dynamic sampling, dynamic probing (DPSH and DPH) and simultaneous casing of boreholes.

The rig is powered by a portable hydraulic power pack, which can be operated approximately 10m away from the rig, and with a mast height of just 2.1m, it is suitable for working below OHLE structures as well as requiring a base area of just 1.5m by 1m.

The firm says that the modular rig has been used already on a number of projects with many more scheduled. The unit’s versatility is said to open up new geotechnical opportunities especially on limited headroom sites, under bridges or on embankments and cuttings for roads. Meanwhile its compact size and construction also allows the unit to be used inside buildings or tunnels.

For more information on companies in this article

Related Content

  • Brisbane’s new airport link is an engineering success
    April 12, 2013
    Financial troubles for Brisbane's new Airport Link overshadow its construction success – Adrian Greeman writes. Political argument and legal dispute is likely to rage for some time yet over the bankruptcy of Australian road operator BrisConnect, which went into receivership this February with A$3 billion in debt. Toll paying users for its new Airport Link have been less than half the predicted numbers since it opened in July last summer. But if its nancial engineering is being questioned, the same is not t
  • Foundations for Mexico highway with help from Liebherr
    November 9, 2017
    A Liebherr rotary drill rig and oscillator combination has been working in Mexico on a highway project for contractor Mota-Engil. A Liebherr piling rig is playing an important role on a major Mexican highway construction project being carried out by a division of the Portuguese firm Mota-Engil. The use of the rig by Mota-Engil Mexico’s newly formed geotechnical division is helping to set new quality standards for piling in the country. The contractor is leasing one of the latest Liebherr LB 24-270 rotary
  • Driving advances in engines and drivelines
    February 27, 2019
    Technology advances for engine and driveline systems continue - Mike Woof writes With the Stage V emissions requirements being introduced in Europe, a number of engine manufacturers have already announced their plans. Leading engine makers such as Cummins, Deutz, John Deere, Perkins and Volvo Penta have all released information regarding the engines that they will be offering. The new standard introduces the particulate particle count (PN) and applies to all diesel engines above 19kW for off-road applic
  • Preparations are underway for a new bridge in Venezuela
    June 25, 2013
    A large bridge project is being planned in Venezuela, with ground investigation leading the way In Venezuela, preparation work is now being carried out for a major new bridge project. The European geotechnical specialist Lankelma is supplying its Combifloat C5 jack-up platform, JUP Sandpiper, to begin work on the ground investigation for the new Puente Nigale (in English: Nigale Bridge) over Lake Maracaibo in Venezuela. The Nigale Bridge will be the second crossing over Venezuela’s largest lake. The link,