Skip to main content

Uretek delivers voided soils treatment for UK’s M3 Smart Motorway

Ground engineering specialist Uretek has been treating voided soils as part of maintenance following completion of the UK’s M3 Smart Motorway project. Work is between junctions 2 and 4a where Uretek has provided a non-disruptive alternative to conventional underpinning to solve foundation subsidence problems. The focus for Uretek is an old 900mm corrugated pipe, 73m long. The old pipe has had a new 700mm pipe inserted inside. However, the old pipe is rusting and rapidly deteriorating.
February 8, 2018 Read time: 2 mins
Uretek focussed on old 900mm corrugated pipe that had a new 700mm pipe inserted inside
Ground engineering specialist Uretek has been treating voided soils as part of maintenance following completion of the UK’s M3 Smart Motorway project.


Work is between junctions 2 and 4a where Uretek has provided a non-disruptive alternative to conventional underpinning to solve foundation subsidence problems.

The focus for Uretek is an old 900mm corrugated pipe, 73m long. The old pipe has had a new 700mm pipe inserted inside. However, the old pipe is rusting and rapidly deteriorating.

In order to protect the structural integrity of the old pipe and prevent localised ground collapses at the side of the motorway, Uretek is treating voided soils with polyurethane resin around and above the laid pipes from the ground level downwards. It is doing this with two rows of injections - one from either side of the installed pipe to ensure full coverage.

Treatment depth varies across the area from 1.35-2.6m below ground level, depending on the depth of the pipe.

The contract on behalf of 1146 Balfour Beatty Infrastructure Services is being undertaken overnight to minimise disruption. Around 102 linear metres of soil will be treated over four weeks. Up to 1,350kg - 74kg/m³ - of the geopolymer is expected to be needed.

“Not only do we stabilise the soils, but we fill the expansive voiding surrounding sub-surface service lines, meaning future surface maintenance won’t be compromised,” explained Richard Holmes, managing director of Uretek. “The recyclable nature of the geopolymer being used is not only safe for the environment, but is safe for removal should access to the void be required.”

Uretek UK is a wholly-owned contracting subsidiary of Uretek Worldwide that operates in over 50 countries. Its geopolymer technology has been used for many infrastructure sectors including airport runways, railways, and for everything from foundation re-levelling and ground stabilisation to simple void filling and water sealing.

For more information on companies in this article

Related Content

  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Road repairs take to the air
    November 29, 2018
    Automated road repairs using 3D printing could save money and reduce disruption, reports Kristina Smith It’s the middle of the night and in the street below a team is busy carrying out repairs to the road surface. But there isn’t a human in sight. A road-repair drone has landed at the site of a crack and a 3D asphalt printer is now busy filling in that crack. A group of traffic cone drones have positioned themselves around the repair location to protect the repair drone and divert traffic around it.
  • Road recycling saves time and costs, reduces emissions
    February 13, 2012
    Stabilisers bring recycling improvements to roads in the UK and Armenia. The local road authorities near the UK city of Bath have saved nearly €250,500 on the cost of repairing a 400m long section of the B3110 Midford Road. This saving has been achieved by opting to recycle and strengthen in-situ the existing surface, instead of using conventional full depth pavement reconstruction.