Skip to main content

Under-bridge inspection unit aids Philippines road improvements

The Philippine government's public works department believes its new Italian-sourced under bridge inspection unit will offer "complete safety" during structural investigations. The ABC 110/L from Barin, based in Cittadella, north east Italy, has a 2-Axle Volvo FLL 240 42R Chassis and occupies just one road lane, to enable continued traffic flow. The machine has a bridge barrier clearance of 2.25m, a path clearance of 2m and a horizontal outreach underbridge of 11m. With a vertical depth underbridge of 6.60m
April 16, 2012 Read time: 1 min
The Philippine government is using Barin's ABC 110/L for under bridge inspections

The Philippine government's public works department believes its new Italian-sourced under bridge inspection unit will offer "complete safety" during structural investigations

The 1512 ABC 110/L from 1481 Barin, based in Cittadella, north east Italy, has a 2-Axle 2394 Volvo FLL 240 42R Chassis and occupies just one road lane, to enable continued traffic flow.

The machine has a bridge barrier clearance of 2.25m, a path clearance of 2m and a horizontal outreach underbridge of 11m.

With a vertical depth underbridge of 6.60m, the ABC 110/L also has a 600kg platform capacity, a 1.05m platform width, a sixminute erecting cycle and a 180° underbridge platform rotation, 90° on both sides.

The unit has been bought to help deliver the Philippines national roads improvement and management programme.

For more information on companies in this article

Related Content

  • Tough competition in concrete paving market
    February 13, 2012
    One thing is clear in the concrete slipforming sector. This comparatively niche market for equipment is rapidly becoming a good deal more competitive as key manufacturers jostle for position.
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • Self-climbing formwork solution for bridge pylons
    February 27, 2012
    Harsco Infrastructure has provided self-climbing formwork (SCF), which is helping ensure quick and safe access during the construction of a 320m tall pylon for the world’s longest cable-stayed bridge.
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.