Skip to main content

ULMA engineering solutions on the emblematic Arch of Innovation bridge, Brazil

The arch of innovation is a cable-stayed bridge that will connect Zarur, São João, and Cassiano Ricardo avenues in São Paulo, Brazil. With a height of 100m, it has become one of the most iconic bridges in the country of its type, given its peculiar arc shape.
June 21, 2020 Read time: 3 mins

 

This bridge will create a safer and faster route for more than 180,000 vehicles/day, which will ease Sao Paulo's traffic. It will also include a bicycle lane of more than 3.6km.

One of the most relevant requirements in this project has been the versatility of the systems and the safety of the operators. To this end, the engineering team developed an integrated solution with the ideal formwork and scaffolding systems and applications for the pylons and the roads that run between them. The Queiroz Galvão construction company has once again trust in ULMA's engineering solutions, as well as in the capacity to respond to a project with stringent execution deadlines.

ULMA pic2The ATR self-climbing system was chosen for the two pylons with variable inclination and four-sided section, in combination with the VMK timber-beam formwork for the outside and the KSP platform for the inside. The self-climbing system has been perfectly adapted to the inclination and elliptical curve of the shaft of up to 23º in the last concreting. The whole set has allowed high execution rates, three-day concreting cycles in 3.6m high sections, without the need for a crane. In addition, it has three levels of working platforms for carrying out work on the formwork, rebar or concrete, as well as for lifting the structure, maintaining strict safety levels at great heights at all times. The platforms were designed in such a way that it was possible to regulate the angle to maintain horizontality as the arch progressed.  Despite the complexity of the geometry, the MK system has solved all the structural requirements.

With regard to productivity, the use of self-climbing formwork halves working times compared to a conventional climbing system in this type of project. This is because the system requires less handling. As the movement is carried out using a hydraulic system, there is minimal use of the crane, which is freed up for other tasks.

The two carriageways rest on an X shape. They were built with ENKOFORM HMK, supported by T-60 shoring towers. A solution of MK gantry formwork was proposed for the rest of the board to avoid closing the tracks.

For the construction of the arch section of the bridge, a supporting structure made of MK and VM beams supported by T-60 shoring systems was constructed. Custom metal profiles bear all the weight of the T-60 shoring system.

To access the different areas of the bridge, BRIO stairs were enabled on each side of the arch and in two separate sections. The first section is 60m-high and rests on the ground. The second section, 40m-high, consists of three independent staircases arranged on BMK consoles on the arch.

Constructor: QUEIROZ GALVÃO CONSTRUCTION COMPANY.


Sponsored content produced in association with ULMA Construction

For more information on companies in this article

Related Content

  • Pilosio and CMC Ravenna collaborate on Cornubia Interchange
    June 4, 2019
    The South African branch of the Italian construction company CMC di Ravenna again teamed up with formwork specialist Pilosio to take advantage of Pilosio's solutions. This time it was for construction of a new bridge in the city of Durban, a project named N2/Cornubia Interchange. The overpass will streamline traffic by linking the Umhlanga industrial zone with the Cornubia new development area Tongat. Cornubia is a multibillion rand integrated settlement near Umhlanga, north of Durban, in KwaZulu Natal,
  • New and User-friendly PERI UP Scaffolding Components Combine Efficiency and Safety
    June 1, 2021
    The tried and tested components of the PERI UP Scaffolding Kit are now available in optimised form
  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • Lochkov bridge construction time 'cut'
    July 17, 2012
    As part of the R1 southern orbital motorway around the Czech capital, Prague, a joint venture is building a five-span, 461m long and approximately 65m high viaduct near the village of Lochkov, as a girder bridge construction. For the two steeply inclined twin piers, Doka has supplied an automatic climbing formwork solution that obviates the need for shoring and that will "cut more than 100 days from the construction period." Cast-in-place concrete construction of bridge piers with such a steep inclination