ULMA engineering solutions on the emblematic Arch of Innovation bridge, Brazil

The arch of innovation is a cable-stayed bridge that will connect Zarur, São João, and Cassiano Ricardo avenues in São Paulo, Brazil. With a height of 100m, it has become one of the most iconic bridges in the country of its type, given its peculiar arc shape.
June 21, 2020 Read time: 3 mins

 

This bridge will create a safer and faster route for more than 180,000 vehicles/day, which will ease Sao Paulo's traffic. It will also include a bicycle lane of more than 3.6km.

One of the most relevant requirements in this project has been the versatility of the systems and the safety of the operators. To this end, the engineering team developed an integrated solution with the ideal formwork and scaffolding systems and applications for the pylons and the roads that run between them. The Queiroz Galvão construction company has once again trust in ULMA's engineering solutions, as well as in the capacity to respond to a project with stringent execution deadlines.

ULMA pic2The ATR self-climbing system was chosen for the two pylons with variable inclination and four-sided section, in combination with the VMK timber-beam formwork for the outside and the KSP platform for the inside. The self-climbing system has been perfectly adapted to the inclination and elliptical curve of the shaft of up to 23º in the last concreting. The whole set has allowed high execution rates, three-day concreting cycles in 3.6m high sections, without the need for a crane. In addition, it has three levels of working platforms for carrying out work on the formwork, rebar or concrete, as well as for lifting the structure, maintaining strict safety levels at great heights at all times. The platforms were designed in such a way that it was possible to regulate the angle to maintain horizontality as the arch progressed.  Despite the complexity of the geometry, the MK system has solved all the structural requirements.

With regard to productivity, the use of self-climbing formwork halves working times compared to a conventional climbing system in this type of project. This is because the system requires less handling. As the movement is carried out using a hydraulic system, there is minimal use of the crane, which is freed up for other tasks.

The two carriageways rest on an X shape. They were built with ENKOFORM HMK, supported by T-60 shoring towers. A solution of MK gantry formwork was proposed for the rest of the board to avoid closing the tracks.

For the construction of the arch section of the bridge, a supporting structure made of MK and VM beams supported by T-60 shoring systems was constructed. Custom metal profiles bear all the weight of the T-60 shoring system.

To access the different areas of the bridge, BRIO stairs were enabled on each side of the arch and in two separate sections. The first section is 60m-high and rests on the ground. The second section, 40m-high, consists of three independent staircases arranged on BMK consoles on the arch.

Constructor: QUEIROZ GALVÃO CONSTRUCTION COMPANY.


Sponsored content produced in association with ULMA Construction

For more information on companies in this article

Related Content

  • Arched bridge challenge over the Oparno
    February 29, 2012
    For environmental reasons planners decided in favour of the challenging task of constructing a 13-field arched highway bridge over the Oparno Valley in the Bohemian area of the Czech Republic. The 258m bridge, whose reinforced concrete arch has a span of 135m, straddles the valley without any bridge piers, transferring the loads in the form of compressive forces into the foundations.
  • ULMA on the Guadiana Bridge
    October 5, 2021
    Heavy onsite winds and the simultaneous renovation of both pylons were challenges for ULMA when it supplied scaffolding for work on the Guadiana International Bridge
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • Peri’s formwork and shoring solution for the “East End Crossing”
    July 6, 2016
    Pylons almost 90m high are a striking feature of a new cable-stayed East End Crossing bridge over the Ohio River in Louisville, Kentucky state in the US The pylons are characterised by their complex shapes and massive legs and cross beams. Peri provided a comprehensive overall concept for its construction – consisting of a planning solution with perfectly matched formwork, climbing, shoring and scaffolding systems along with extensive on-site support. With a Peri solution, the construction crew were a