Skip to main content

Ulma Construction expands circular formwork offering with Biramax

Spanish company Ulma Construction said that is has developed Biramax in an effort to create adjustable formwork at once easy to assemble and profitable for the client, in terms of both use and durability. The adjustable circular formwork Biramax has only four adjustment points and the placement of compensation plates between panels is easy to accomplish. The panel frame is made of the high-quality and resistant galvanised steel and the plastic surface of the formwork panels is highly moisture resista
October 28, 2016 Read time: 2 mins
Spanish company Ulma Construction said that is has developed Biramax in an effort to create adjustable formwork at once easy to assemble and profitable for the client, in terms of both use and durability.

The adjustable circular formwork Biramax has only four adjustment points and the placement of compensation plates between panels is easy to accomplish.

The panel frame is made of the high-quality and resistant galvanised steel and the plastic surface of the formwork panels is highly moisture resistant. Ulma says that this means it’s easy to maintain and repair and the plastic-coated plywood panels offers excellent concrete finishes.

Biramax formwork has a minimum curvature radius of 2m and is resistant to high concrete pressures, up to 80kN/m2. Various platforms are available that guarantee worker safety both during assembly of the system and concrete-pouring phases.

The development of Biramax has been possible through the company’s continuous programme of research and customer feedback that has focused on safety and efficiency for the work force that translates into profitability for its clients.

Ulma said that Biramax complements its ENKOFORM VMK and ENKOFORM V-100 timber beam formwork to shape any circular wall, whether it be of varied or fixed radius, for installations such as water tanks, storage areas and tunnels.

Ulma’s global projects include the El Salto Viaduct near Santiago, Chile,  the bypass road and motorway in Port of El Salvador, Brazil, and the 34km motorway A4 and overpass E118 on the Tarnów – Dębica route in Poland.

Related Content

  • Pilosio builds up its formwork offering with the flying table ST80
    January 6, 2017
    Pilosio’s new flying table ST80 is ideal for high construction work where pouring cycles repeat from one level to another. Flying forms are constituted by large sections of formwork, featuring supporting trusses, joists and aluminum posts. This system is used to cast slab areas with tables that can be designed in order to reach up to lengths of 30m and widths of 6m. The system enhances also side flaps in order to handle spaces between columns and slab edges.
  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req
  • ULMA's complete climbing solutions
    January 1, 2018
    ULMA's complete climbing solutions is an integral package that provides forming, climbing, and safety in a single product line. We offer an integrated solution that adapts to any height and geometry, is cost-effective, and increases on-site productivity.
  • Peri raises its game with hydraulic cylinder for UP Rosett props
    February 3, 2015
    Peri is highlighting several of its premier products this year, including the company’s panel wall formwork Maximo, its Gridflex grid slab formwork and the Peri UP Rosett Flex props. Intermat also marks the introduction of Maximo into the French market. The product makes the best use of manpower when on-site manpower is at a premium. The one-sided tie installation by only one person reduces the time needed to set up the formwork. Ties are installed from one side without spacer tubes and there is reduced