Skip to main content

Ulma Construction expands circular formwork offering with Biramax

Spanish company Ulma Construction said that is has developed Biramax in an effort to create adjustable formwork at once easy to assemble and profitable for the client, in terms of both use and durability. The adjustable circular formwork Biramax has only four adjustment points and the placement of compensation plates between panels is easy to accomplish. The panel frame is made of the high-quality and resistant galvanised steel and the plastic surface of the formwork panels is highly moisture resista
October 28, 2016 Read time: 2 mins
Spanish company Ulma Construction said that is has developed Biramax in an effort to create adjustable formwork at once easy to assemble and profitable for the client, in terms of both use and durability.

The adjustable circular formwork Biramax has only four adjustment points and the placement of compensation plates between panels is easy to accomplish.

The panel frame is made of the high-quality and resistant galvanised steel and the plastic surface of the formwork panels is highly moisture resistant. Ulma says that this means it’s easy to maintain and repair and the plastic-coated plywood panels offers excellent concrete finishes.

Biramax formwork has a minimum curvature radius of 2m and is resistant to high concrete pressures, up to 80kN/m2. Various platforms are available that guarantee worker safety both during assembly of the system and concrete-pouring phases.

The development of Biramax has been possible through the company’s continuous programme of research and customer feedback that has focused on safety and efficiency for the work force that translates into profitability for its clients.

Ulma said that Biramax complements its ENKOFORM VMK and ENKOFORM V-100 timber beam formwork to shape any circular wall, whether it be of varied or fixed radius, for installations such as water tanks, storage areas and tunnels.

Ulma’s global projects include the El Salto Viaduct near Santiago, Chile,  the bypass road and motorway in Port of El Salvador, Brazil, and the 34km motorway A4 and overpass E118 on the Tarnów – Dębica route in Poland.

Related Content

  • Brazil: contractors fear more layoffs as DNIT fails to pay up
    November 25, 2014
    The head of Brazil’s association of road constructors has warned of more layoffs unless the National Department of Infrastructure and Transport (DNIT) starts paying its contractors. Jose Alberto Pereira Ribeiro, president of ANEOR – National Association of Road Works - said companies already have been forced to lay off around 1,700 workers in light of non-payment by the government. Another 950 employees are on forced holidays. Ribeiro claimed DNIT failed to meet its financial obligations for September
  • Turning the construction industry green
    May 12, 2023
    Green is good for industry – delivering sustainability can also help reduce costs for construction firms, ensuring better financial performance
  • US$1.7bn to boost California highway infrastructure
    May 27, 2025
    Projects include rehabilitating roadway and drainage systems and upgrading safety along Interstate 805
  • Paschal has the angle
    December 16, 2020
    Formwork manufacturer Paschal says that it has further expanded the application range of its lightweight multi-waler by developing a hinge piece.