Skip to main content

TensarTech supports Polish contract

TensarTech soil retaining walls have been used during the construction of a section of the A1 motorway in Poland. Extensive underground mining in the south of the country posed a significant challenge to building the 16km Piekary Slaskie to Pyrzowice (Katowice Airport) stretch of the motorway which, on completion, will run more than 240km from Gdansk in northern Poland to Gorzyczki on the Polish-Czech Republic border. To accommodate potential differences in settlement on embankments approaching a series of
November 12, 2012 Read time: 2 mins
TensarTech TW1 retaining wall technology was used extensively on the new A1 motorway near Piekary, Poland
340 Tensar soil retaining walls have been used during the construction of a section of the A1 motorway in Poland.

Extensive underground mining in the south of the country posed a significant challenge to building the 16km Piekary Slaskie to Pyrzowice (Katowice Airport) stretch of the motorway which, on completion, will run more than 240km from Gdansk in northern Poland to Gorzyczki on the Polish-Czech Republic border.

To accommodate potential differences in settlement on embankments approaching a series of viaducts and bridges along the route, project designers the Transprojekt Krakow and Complex Projekt Katowice Consortium (TKCPKC), recommended TensarTech soil retaining walls to contractors 3302 Budimex SA. This was said to ensure that any problems caused by previous land use were mitigated. The 16km route opened in June 2012, in time for the Euro 2012 football championships held in Poland and Ukraine.

 “The A1 motorway project is highly important for improving the strategic transport infrastructure between South East Europe to the Baltic,” said Dr Jacek Kawalec, Tensar business manager Europe. “However, the region south of Piekary has been extensively mined for coal, metal and minerals for centuries, with black coal still being extracted.

“As a result, there are extensive and often unknown tunnels, voids, weak spots, unconsolidated spoil heaps and other unstable sections. Unpredictable movement of the ground could cause great damage to a major road structure, and even threaten life.”

Use of conventional techniques, such as piling to stabilise the ground and minimise the effects of any settlement, would have been very costly. The TensarTech solution chosen for the A1 project by TKCPKC was said to have been proven previously in Poland, including on another section of the A1 motorway.

The Piekary section of the A1 passes through a populated area, and there are 17 connections with existing roads, via overpass bridges and viaducts, and one railway viaduct. Eight of these are constructed with TensarTech soil retaining structures. The TensarTech solution for the A1 used locally available aggregates, including colliery spoil.

For more information on companies in this article

Related Content

  • Upgrading Poland's roads for UEFA 2012
    May 2, 2012
    Championships in 2012. With plans in place to cohost the UEFA 2012 football championships with the Ukraine, Poland's road infrastructure is undergoing major developments to bring it up to date with the rest of the European Union. And to ensure the completed roads and pavements meet the required quality standards, Cooper Technology of Derby, UK, was awarded a contract to provide asphalt testing equipment to
  • Geosynthetic drainage technology developments
    June 13, 2012
    An innovative solution to providing vital, low-impact surface water control for one of Britain’s largest local authority road schemes is said to have been recently achieved using Hydro International’s (HI) Hydro Vortex Drop Shaft  ow control technology. The new 7km bypass built by Costain at Church Village, near Pontypridd, South Wales, required careful planning to minimise its effect on the countryside and the local environment. Rhondda Cynon Taff Council needed to bypass Church Village to reduce traf c
  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en
  • Strabag wins Polish road contract
    September 17, 2018
    Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.