Skip to main content

Sennenbogen’s 6130 HD with diaphragm wall grab on site in Berlin

Berger Grundbautechnik is using two Sennenbogen duty cycle cranes simultaneously for preparatory works for the planned BAB 100 motorway in Berlin. The new stretch of motorway will connect the eastern areas of Berlin to the central road circuit and the BAB 113. Large sections of the section being built run in a tunnel or in a trough of up to 7m. Hard at it are the Sennenbogen 690 HD and the new 6130 HD units. With a working weight of 130tonnes and two 300kN free-fall winches, the 6130 HD operates a 25tonne
December 18, 2017 Read time: 2 mins
Sennenbogen’s 6130 HD: preparatory work for the BAB 100 motorway

Berger Grundbautechnik is using two Sennenbogen duty cycle cranes simultaneously for preparatory works for the planned BAB 100 motorway in Berlin.

The new stretch of motorway will connect the eastern areas of Berlin to the central road circuit and the BAB 113. Large sections of the section being built run in a tunnel or in a trough of up to 7m. Hard at it are the Sennenbogen 690 HD and the new 6130 HD units.

With a working weight of 130tonnes and two 300kN free-fall winches, the 6130 HD operates a 25tonne diaphragm wall grabber for digging diaphragm walls at depths up to 25m.

The 6130 machine is also driven by a powerful 570kW diesel engine which ensures sufficient power reserves. The free-fall speed with the two winches is easily regulated via a potentiometer. The machine's powerful winch strength and high load capacity allow for a fluid and rapid work process, even with heavy grapples.

To be precise, the driver first inserts the grapple into the recess and then allows this to fall repeatedly against the ground with the shovel open. This action loosens the material which can then be dug up from below ground. The smooth sand-gravel wash is then deposited directly beside the machine.

The result is an exact, straight diaphragm wall construction which, with the addition of reinforced concrete, later becomes the foundation for building. The driver requires only a couple of minutes for one cycle - from sinking the grapple to breaking up the sand layers to unloading the material.

Despite the high dynamic requirements, the duty cycle crane remains stable and secure due to its particularly well-balanced machine conception with the 7.2m long track rollers. The caterpillar undercarriage telescopes out hydraulically to a track width of up to 4.1m. In the current configuration, the machine works with a heavy-duty boom running up to 27m long.

Related Content

  • Kögel is offering tough and lightweight tipping trailers
    March 14, 2013
    Heavy equipment trailer specialist Kögel has developed two novel tipper trailers, featuring two and three axles.The two axle tipper trailer offers a load volume of 24m³ or 27m³ with a 4mm-thick Hardox 450 base and side walls made from aluminium. The advantage of the steel base with lightweight walls means that it can be used continuously for more than 10 years, while an aluminium trough would need repairs every two to three years.
  • Kögel is offering tough and lightweight tipping trailers
    January 6, 2017
    Heavy equipment trailer specialist Kögel has developed two novel tipper trailers, featuring two and three axles.The two axle tipper trailer offers a load volume of 24m³ or 27m³ with a 4mm-thick Hardox 450 base and side walls made from aluminium. The advantage of the steel base with lightweight walls means that it can be used continuously for more than 10 years, while an aluminium trough would need repairs every two to three years.
  • Developments in excavators and loaders
    February 14, 2012
    In the earthmoving sector, much development is being seen in excavators and wheeled loaders used for digging and loading, Mike Woof reports
  • Simex machine helps deliver new tunnel lining
    December 1, 2014
    In Italy an MP1000 cutting system from Simex has been used to help resurface the walls of a highway tunnel. The SS51 State Road crosses through the Dolomites in the north-eastern Alpine Region of Italy. The SS51 starts in San Vendemiano in the province of Treviso and ends in Dobbiaco in the province of Bolzano and is a key road because it connects Cadore and the main towns in the area of Cortina d'Ampezzo. This 134.4 km road has expansion work and upgrades to improve safety and boost capacity. One the mo