Skip to main content

Sennenbogen’s 6130 HD with diaphragm wall grab on site in Berlin

Berger Grundbautechnik is using two Sennenbogen duty cycle cranes simultaneously for preparatory works for the planned BAB 100 motorway in Berlin. The new stretch of motorway will connect the eastern areas of Berlin to the central road circuit and the BAB 113. Large sections of the section being built run in a tunnel or in a trough of up to 7m. Hard at it are the Sennenbogen 690 HD and the new 6130 HD units. With a working weight of 130tonnes and two 300kN free-fall winches, the 6130 HD operates a 25tonne
December 18, 2017 Read time: 2 mins
Sennenbogen’s 6130 HD: preparatory work for the BAB 100 motorway

Berger Grundbautechnik is using two Sennenbogen duty cycle cranes simultaneously for preparatory works for the planned BAB 100 motorway in Berlin.

The new stretch of motorway will connect the eastern areas of Berlin to the central road circuit and the BAB 113. Large sections of the section being built run in a tunnel or in a trough of up to 7m. Hard at it are the Sennenbogen 690 HD and the new 6130 HD units.

With a working weight of 130tonnes and two 300kN free-fall winches, the 6130 HD operates a 25tonne diaphragm wall grabber for digging diaphragm walls at depths up to 25m.

The 6130 machine is also driven by a powerful 570kW diesel engine which ensures sufficient power reserves. The free-fall speed with the two winches is easily regulated via a potentiometer. The machine's powerful winch strength and high load capacity allow for a fluid and rapid work process, even with heavy grapples.

To be precise, the driver first inserts the grapple into the recess and then allows this to fall repeatedly against the ground with the shovel open. This action loosens the material which can then be dug up from below ground. The smooth sand-gravel wash is then deposited directly beside the machine.

The result is an exact, straight diaphragm wall construction which, with the addition of reinforced concrete, later becomes the foundation for building. The driver requires only a couple of minutes for one cycle - from sinking the grapple to breaking up the sand layers to unloading the material.

Despite the high dynamic requirements, the duty cycle crane remains stable and secure due to its particularly well-balanced machine conception with the 7.2m long track rollers. The caterpillar undercarriage telescopes out hydraulically to a track width of up to 4.1m. In the current configuration, the machine works with a heavy-duty boom running up to 27m long.

Related Content

  • 'Soft' option gets results
    February 8, 2012
    Soft engineering techniques, used to prevent soil erosion and stabilise steep cuts and embankments, have allowed engineers to successfully widen the M1 motorway in the UK. Over the 50km length of the work (25km northbound, 25km southbound) on a busy section of the motorway near the city of Nottingham, a total of 48km of slopes had to be modified, split roughly between cutting and embankment. The UK Highways Agency requirements for the work meant that wholesale widening of the corridor was not possible: the
  • Doosan’s new DX140LC-3 and DX160LC-3 crawler excavators
    June 24, 2013
    Both machines are powered by Doosan’s DL06K ‘common rail’ six-cylinder turbocharged diesel engine, said to meet Stage IIIB engine emission regulations through the use of EGR (Exhaust Gas Recirculation) and Diesel Particulate Filter (DPF) after-treatment technologies. The engine has a displacement of 5,890cm³ and is said to deliver 15% more power [82 kW @ 1850RPM] than previous Stage IIIA models. The engine also delivers 11% more torque (49.5kgf.m) in the DX160LC-3 model. Doosan said that factory tests had
  • Digging It gets down with Hyundai fleet
    October 3, 2018
    Ben Boare is the founder and managing director of Digging It Groundworks – a multifaceted construction company based in Andover in southern England. Boare formed Digging in 2007. “We initially started out doing small groundworks jobs, but as the years pass by we are focusing more and more on the plant hire side of things and our crushing, screening and recycling operation,” he said. The company has historically run a mixed fleet of hydraulic excavators, including JCB, Volvo, Takeuchi and Kubota. But in re
  • Pilosio and CMC Ravenna collaborate on Cornubia Interchange
    June 4, 2019
    The South African branch of the Italian construction company CMC di Ravenna again teamed up with formwork specialist Pilosio to take advantage of Pilosio's solutions. This time it was for construction of a new bridge in the city of Durban, a project named N2/Cornubia Interchange. The overpass will streamline traffic by linking the Umhlanga industrial zone with the Cornubia new development area Tongat. Cornubia is a multibillion rand integrated settlement near Umhlanga, north of Durban, in KwaZulu Natal,