Skip to main content

Sennenbogen’s 6130 HD with diaphragm wall grab on site in Berlin

Berger Grundbautechnik is using two Sennenbogen duty cycle cranes simultaneously for preparatory works for the planned BAB 100 motorway in Berlin. The new stretch of motorway will connect the eastern areas of Berlin to the central road circuit and the BAB 113. Large sections of the section being built run in a tunnel or in a trough of up to 7m. Hard at it are the Sennenbogen 690 HD and the new 6130 HD units. With a working weight of 130tonnes and two 300kN free-fall winches, the 6130 HD operates a 25tonne
December 18, 2017 Read time: 2 mins
Sennenbogen’s 6130 HD: preparatory work for the BAB 100 motorway

Berger Grundbautechnik is using two Sennenbogen duty cycle cranes simultaneously for preparatory works for the planned BAB 100 motorway in Berlin.

The new stretch of motorway will connect the eastern areas of Berlin to the central road circuit and the BAB 113. Large sections of the section being built run in a tunnel or in a trough of up to 7m. Hard at it are the Sennenbogen 690 HD and the new 6130 HD units.

With a working weight of 130tonnes and two 300kN free-fall winches, the 6130 HD operates a 25tonne diaphragm wall grabber for digging diaphragm walls at depths up to 25m.

The 6130 machine is also driven by a powerful 570kW diesel engine which ensures sufficient power reserves. The free-fall speed with the two winches is easily regulated via a potentiometer. The machine's powerful winch strength and high load capacity allow for a fluid and rapid work process, even with heavy grapples.

To be precise, the driver first inserts the grapple into the recess and then allows this to fall repeatedly against the ground with the shovel open. This action loosens the material which can then be dug up from below ground. The smooth sand-gravel wash is then deposited directly beside the machine.

The result is an exact, straight diaphragm wall construction which, with the addition of reinforced concrete, later becomes the foundation for building. The driver requires only a couple of minutes for one cycle - from sinking the grapple to breaking up the sand layers to unloading the material.

Despite the high dynamic requirements, the duty cycle crane remains stable and secure due to its particularly well-balanced machine conception with the 7.2m long track rollers. The caterpillar undercarriage telescopes out hydraulically to a track width of up to 4.1m. In the current configuration, the machine works with a heavy-duty boom running up to 27m long.

Related Content

  • New tunnelling machines are coming to market
    May 13, 2015
    Major gains in tunnelling productivity and performance are claimed for a series of new machines now coming to market These new tools will help contractors boost productivity and versatility in an array of applications. The new equipment items are designed for a variety of tasks, including drilling and shotcreting duties. One of the leaders in the underground equipment sector, Atlas Copco, has a new line-up of single and twin boom drill rigs, which suit duties in smaller tunnelling applications. The fi
  • Hybrid technology for Hamm’s HD+ 90i PH tandem roller goes on show
    April 23, 2018
    Hamm is claiming a first with its hybrid 9 tonne HD+ 90i PH tandem roller. The German manufacturer believes that it is the first roller manufacturer to develop a production-ready machine. Most hybrid solutions, as in the case of cars, combine an internal combustion engine with an electric motor. Hamm has instead combined an internal combustion engine with a hydraulic system for the tandem roller. Although the maximum load is used regularly for compacting, it is always just for a few seconds at a time.
  • Crane versatility helps with bridge building
    August 14, 2014
    The versatility and mobility of a Terex crawler crane has helped enormously with the construction of a new road bridge in Luxemburg. The Terex Superlift 3800 lattice boom crawler crane owned by Trier-based Steil Kranarbeiten was used to build a bridge in Luxemburg only two days after the same machine was used on a job in the Hunsrück mountain range. The machine was needed to lift a 440m long bridge across a valley, connecting a new section of highway.
  • Asphalt paving is seeing innovative new technology
    April 4, 2013
    With new machines coming to market, the asphalt paving sector is seeing an array of sophisticated technology now available