Skip to main content

Sennenbogen’s 6130 HD with diaphragm wall grab on site in Berlin

Berger Grundbautechnik is using two Sennenbogen duty cycle cranes simultaneously for preparatory works for the planned BAB 100 motorway in Berlin. The new stretch of motorway will connect the eastern areas of Berlin to the central road circuit and the BAB 113. Large sections of the section being built run in a tunnel or in a trough of up to 7m. Hard at it are the Sennenbogen 690 HD and the new 6130 HD units. With a working weight of 130tonnes and two 300kN free-fall winches, the 6130 HD operates a 25tonne
December 18, 2017 Read time: 2 mins
Sennenbogen’s 6130 HD: preparatory work for the BAB 100 motorway

Berger Grundbautechnik is using two Sennenbogen duty cycle cranes simultaneously for preparatory works for the planned BAB 100 motorway in Berlin.

The new stretch of motorway will connect the eastern areas of Berlin to the central road circuit and the BAB 113. Large sections of the section being built run in a tunnel or in a trough of up to 7m. Hard at it are the Sennenbogen 690 HD and the new 6130 HD units.

With a working weight of 130tonnes and two 300kN free-fall winches, the 6130 HD operates a 25tonne diaphragm wall grabber for digging diaphragm walls at depths up to 25m.

The 6130 machine is also driven by a powerful 570kW diesel engine which ensures sufficient power reserves. The free-fall speed with the two winches is easily regulated via a potentiometer. The machine's powerful winch strength and high load capacity allow for a fluid and rapid work process, even with heavy grapples.

To be precise, the driver first inserts the grapple into the recess and then allows this to fall repeatedly against the ground with the shovel open. This action loosens the material which can then be dug up from below ground. The smooth sand-gravel wash is then deposited directly beside the machine.

The result is an exact, straight diaphragm wall construction which, with the addition of reinforced concrete, later becomes the foundation for building. The driver requires only a couple of minutes for one cycle - from sinking the grapple to breaking up the sand layers to unloading the material.

Despite the high dynamic requirements, the duty cycle crane remains stable and secure due to its particularly well-balanced machine conception with the 7.2m long track rollers. The caterpillar undercarriage telescopes out hydraulically to a track width of up to 4.1m. In the current configuration, the machine works with a heavy-duty boom running up to 27m long.

Related Content

  • Innovative earthmovers coming to market
    October 12, 2017
    A wide range of innovative earthmover solutions is now coming to market - Mike Woof writes Generally with major construction equipment exhibitions timed for the second quarter of each year, this is when manufacturers will roll out their latest earthmoving solutions. However 2017 has turned out to be something of an anomaly, with the major firms continuing to unveil new models. Firms have introduced new wheeled loaders, excavators, and dozers, although arguably, some of the most interesting developments
  • Excavation offering
    July 16, 2012
    There are various ways of building a tunnel, and for excavation jobs many contractors prefer to use versions of standard machines that have instead been converted to suit the confines of tunnelling applications. Some contractors opt to adapt their own units and with ventilation being an issue in underground work, engine emissions are a key focus when adapting machines. Exhaust filters and other after treatment solutions are usually required and there are an array of off-the-shelf packages available as well
  • Novel concrete paving method used in Germany
    January 25, 2017
    A novel dual-layer concrete paving technique has been used on jobsites in Germany on the country’s high-speed Autobahn network This technique allows the construction of a strong and durable roadway structure able to cope with heavy traffic loads and offer a long working life. In four German states, Wirtgen SP-1500 slipformers have been employed by four different contractors to carry out dual-layer paving. The method allows a noise-reducing, non-skid exposed aggregate surface to be placed over a bottom
  • Brisbane's highway of distinction
    August 2, 2012
    A massive AU$2 billion update of the Gateway Motorway in Queensland is underway to improve an infrastructure stretched by population boom. Report and photographs by Adrian Greeman Just 20 years after the Australian city of Brisbane built its Gateway Motorway with a high slim signature bridge dominating the river skyline, the road is being completely revamped. Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels; the north is getting a completely