Skip to main content

Sennebogen gives Danube bridge restoration a lift

Built in the 12th century, the Stone Bridge spans the River Danube as the most significant emblem of the city of Regensburg, in southern Germany. In the course of the protracted restoration work, Strabag is using a new Sennebogen 608 Multicrane for various lifting and construction tasks. Although the historic structure of the city was built within only 11 years, between 1135 and 1146, the restoration tasks for the Stone Bridge at Regensburg have been underway for three years and are not expected to be co
April 2, 2014 Read time: 2 mins
Built in the 12th century, the Stone Bridge spans the River Danube as the most significant emblem of the city of Regensburg, in southern Germany. In the course of the protracted restoration work, Strabag is using a new 2924 Sennebogen 608 Multicrane for various lifting and construction tasks.

Although the historic structure of the city was built within only 11 years, between 1135 and 1146, the restoration tasks for the Stone Bridge at Regensburg have been underway for three years and are not expected to be completed until the end of 2017.

Currently the existing access ramp to the Oberer Wöhrd municipal area is being rebuilt by 945 Strabag’s Roding Branch, partly with the help of the 608 Multicrane as a construction site crane.

Equipped with a 91kW diesel engine, and thanks to the compact dimensions and convenient all-wheel steering, the mobile 608 model is said to be particularly well-suited for this deployment site, located between the two arms of the Danube. At a height of just 3.15m and a width of 2.55m, the machine is easy to move and can also be used under the narrow arches of the bridge.

For more information on companies in this article

Related Content

  • The next generation of the WR series delivers higher mixing performance and quality
    June 2, 2025
    At bauma, Wirtgen presented the latest generation of the WR series, developed by the company especially for cold recycling and stabilisation applications. The machines impress with an optimised operating concept and consistently high productivity and mixing quality. With the new operator’s cabin and a revised and improved operating concept, the WR series machines enable the achievement of particularly efficient and cost-effective workflows.
  • Budapest’s Széchenyi Chain Bridge reopens
    December 22, 2022
    Although open, for the time being only buses, taxis, bicycles and motorcycles can use the famous 19th century bridge that links Buda and Pest which make up the Hungarian capital.
  • Bavarian workload for a Sennebogen 835 E-series material handler
    May 18, 2018
    Sand and gravel extraction in the Main valley has always been a mainstay of family-owned LZR - Lenz Ziegler Reifenscheid - in Kitzingen, Bavaria. Every day, around 800tonnes arrive at the gravel plant via the Main River. The company not only supplies ready-mixed concrete, but is active in demolition and waste disposal. Since mid-2017, a Sennebogen 835 E-series material handler has been operating at the Kitzingen site. Equipped for an 18m reach and with a 2000-l double-shell grab, operator Uwe Marx dredges
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.