Skip to main content

Sennebogen gives Danube bridge restoration a lift

Built in the 12th century, the Stone Bridge spans the River Danube as the most significant emblem of the city of Regensburg, in southern Germany. In the course of the protracted restoration work, Strabag is using a new Sennebogen 608 Multicrane for various lifting and construction tasks. Although the historic structure of the city was built within only 11 years, between 1135 and 1146, the restoration tasks for the Stone Bridge at Regensburg have been underway for three years and are not expected to be co
April 2, 2014 Read time: 2 mins
Built in the 12th century, the Stone Bridge spans the River Danube as the most significant emblem of the city of Regensburg, in southern Germany. In the course of the protracted restoration work, Strabag is using a new 2924 Sennebogen 608 Multicrane for various lifting and construction tasks.

Although the historic structure of the city was built within only 11 years, between 1135 and 1146, the restoration tasks for the Stone Bridge at Regensburg have been underway for three years and are not expected to be completed until the end of 2017.

Currently the existing access ramp to the Oberer Wöhrd municipal area is being rebuilt by 945 Strabag’s Roding Branch, partly with the help of the 608 Multicrane as a construction site crane.

Equipped with a 91kW diesel engine, and thanks to the compact dimensions and convenient all-wheel steering, the mobile 608 model is said to be particularly well-suited for this deployment site, located between the two arms of the Danube. At a height of just 3.15m and a width of 2.55m, the machine is easy to move and can also be used under the narrow arches of the bridge.

For more information on companies in this article

Related Content

  • Clean lifting crane
    December 14, 2022
    Liebherr’s innovative electric crane technology offers the ability to lift heavy loads without emissions. The firm’s new LR 1160.1 unplugged model is the latest in the range, featuring a load capacity of 160tonnes.
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public
  • US$700 million for new Argentina bridge
    November 27, 2023
    A US$700 million loan is helping pay for new bridge in Argentina.
  • JCB targets US$8 billion access market
    February 24, 2017
    JCB has signalled its intention to become a major player in the US$8 billion powered access market. It is entering the sector for the first time with the launch of a brand new range that it has been developing and engineering in secret for the past two years. The company has taken the wraps off an initial nine all-new electric scissor models, and by the end of 2017 the newly-launched JCB Access business says will be offering a total of 27 new platforms, including scissors, articulated booms and teles