Skip to main content

Sennebogen gives Danube bridge restoration a lift

Built in the 12th century, the Stone Bridge spans the River Danube as the most significant emblem of the city of Regensburg, in southern Germany. In the course of the protracted restoration work, Strabag is using a new Sennebogen 608 Multicrane for various lifting and construction tasks. Although the historic structure of the city was built within only 11 years, between 1135 and 1146, the restoration tasks for the Stone Bridge at Regensburg have been underway for three years and are not expected to be co
April 2, 2014 Read time: 2 mins
Built in the 12th century, the Stone Bridge spans the River Danube as the most significant emblem of the city of Regensburg, in southern Germany. In the course of the protracted restoration work, Strabag is using a new 2924 Sennebogen 608 Multicrane for various lifting and construction tasks.

Although the historic structure of the city was built within only 11 years, between 1135 and 1146, the restoration tasks for the Stone Bridge at Regensburg have been underway for three years and are not expected to be completed until the end of 2017.

Currently the existing access ramp to the Oberer Wöhrd municipal area is being rebuilt by 945 Strabag’s Roding Branch, partly with the help of the 608 Multicrane as a construction site crane.

Equipped with a 91kW diesel engine, and thanks to the compact dimensions and convenient all-wheel steering, the mobile 608 model is said to be particularly well-suited for this deployment site, located between the two arms of the Danube. At a height of just 3.15m and a width of 2.55m, the machine is easy to move and can also be used under the narrow arches of the bridge.

For more information on companies in this article

Related Content

  • Information technology and transport development
    February 16, 2012
    A team of eminent Russian specialists* introduce exciting new information technologies, such as the Internet of Things, and foresee their promising applications in the field of transport infrastructure development
  • Road user charging, the way to highway investment?
    February 27, 2012
    Tough political decisions have to be made to ensure highway investment - *Dr Max Lay reports
  • Road user charging, the way to highway investment?
    April 12, 2012
    Tough political decisions have to be made to ensure highway investment - *Dr Max Lay reports Our road systems and how we use them have changed dramatically over the last few centuries, and yet some problems persist and others reappear. For most of human history roads have been used by foot traffic and by cumbersome wagons hauled at walking pace. Roads were built to provide some obvious advantage in commerce or conquest. They were then grudgingly maintained by those who might gain some advantage from the
  • New bridge to span Okavango River in Botswana
    October 17, 2016
    A new bridge is planned that will span the Okavango River in northern Botswana. The bridge will feature a cable-stayed structure and will be 1.2km long in all, with a 400m central section. The project also includes the construction of 3km of roads to connect the new bridge to existing road infrastructure, as well as installing necessary lighting and drainage systems. The project is expected to cost in excess of US$93 million and take three years to complete.