Skip to main content

Sennebogen gives Danube bridge restoration a lift

Built in the 12th century, the Stone Bridge spans the River Danube as the most significant emblem of the city of Regensburg, in southern Germany. In the course of the protracted restoration work, Strabag is using a new Sennebogen 608 Multicrane for various lifting and construction tasks. Although the historic structure of the city was built within only 11 years, between 1135 and 1146, the restoration tasks for the Stone Bridge at Regensburg have been underway for three years and are not expected to be co
April 2, 2014 Read time: 2 mins
Built in the 12th century, the Stone Bridge spans the River Danube as the most significant emblem of the city of Regensburg, in southern Germany. In the course of the protracted restoration work, Strabag is using a new 2924 Sennebogen 608 Multicrane for various lifting and construction tasks.

Although the historic structure of the city was built within only 11 years, between 1135 and 1146, the restoration tasks for the Stone Bridge at Regensburg have been underway for three years and are not expected to be completed until the end of 2017.

Currently the existing access ramp to the Oberer Wöhrd municipal area is being rebuilt by 945 Strabag’s Roding Branch, partly with the help of the 608 Multicrane as a construction site crane.

Equipped with a 91kW diesel engine, and thanks to the compact dimensions and convenient all-wheel steering, the mobile 608 model is said to be particularly well-suited for this deployment site, located between the two arms of the Danube. At a height of just 3.15m and a width of 2.55m, the machine is easy to move and can also be used under the narrow arches of the bridge.

For more information on companies in this article

Related Content

  • Balfour Beatty lifts bridge into place over UK’s M54
    May 14, 2014
    In the UK, Balfour Beatty has lifted a new bridge into place over the M54 motorway as part of a €14.56 million (£12 million) project to connect a new high-tech business park to the road network and to provide access for the new Jaguar Land Rover plant. The bridge, which will serve the i54 business park in South Staffordshire, was delivered for Staffordshire County Council, Wolverhampton City Council and South Staffordshire Council, as part of the Midlands Highways Alliance framework.
  • Quiet lighting from Atlas Copco
    June 25, 2018
    Atlas Copco is launching an LED light tower system designed for low noise operation. The firm says that this diesel-driven LED light tower is quiet when running, suiting it to use in urban and residential areas. With operating noise levels as low as 55dBA, the upgraded HiLight B5+ light tower is well-suited to providing illumination at construction sites located near residential areas. “This is the quietest diesel-powered light tower available on the market to date,” claimed Félix Gómez, spokesperson for
  • Cross Fraser Partnership wins BC tunnel work
    September 27, 2024
    The partnership for the tunnel work near Vancouver in Canada consists of Pomerleau BC, Bouygues Construction Canada and Fomento de Construcciones y Contratas Canada (FCC) and is supported by design and engineering consultant Arcadis.
  • Bobcat’s global launch of new telescopic handlers
    February 2, 2015
    Bobcat is staging the global launch of its new telescopic handler range. The TL358 6m lift height compact telehandler is available with 2.6 or 3tonne lift capacities. Meanwhile, Bobcat’s new 13m and 14m lift height T35130S and T35140S telehandlers are aimed particularly at the rental industry and offering a 3.5tonne maximum lift capacity. The new TL358 6m telehandler has a very compact format, with restricted 2.1m width and height dimensions, allowing easy access to congested areas and small buildings.