Skip to main content

Sennebogen gives Danube bridge restoration a lift

Built in the 12th century, the Stone Bridge spans the River Danube as the most significant emblem of the city of Regensburg, in southern Germany. In the course of the protracted restoration work, Strabag is using a new Sennebogen 608 Multicrane for various lifting and construction tasks. Although the historic structure of the city was built within only 11 years, between 1135 and 1146, the restoration tasks for the Stone Bridge at Regensburg have been underway for three years and are not expected to be co
April 2, 2014 Read time: 2 mins
Built in the 12th century, the Stone Bridge spans the River Danube as the most significant emblem of the city of Regensburg, in southern Germany. In the course of the protracted restoration work, Strabag is using a new 2924 Sennebogen 608 Multicrane for various lifting and construction tasks.

Although the historic structure of the city was built within only 11 years, between 1135 and 1146, the restoration tasks for the Stone Bridge at Regensburg have been underway for three years and are not expected to be completed until the end of 2017.

Currently the existing access ramp to the Oberer Wöhrd municipal area is being rebuilt by 945 Strabag’s Roding Branch, partly with the help of the 608 Multicrane as a construction site crane.

Equipped with a 91kW diesel engine, and thanks to the compact dimensions and convenient all-wheel steering, the mobile 608 model is said to be particularly well-suited for this deployment site, located between the two arms of the Danube. At a height of just 3.15m and a width of 2.55m, the machine is easy to move and can also be used under the narrow arches of the bridge.

For more information on companies in this article

Related Content

  • High quality asphalt compaction from new generation machines
    June 20, 2017
    The latest developments in asphalt compaction equipment will help boost productivity and finish quality. The new generation compactors can utilise the latest generation machine control tools to deliver quality within the short timeframe determined by the asphalt temperature. Ammann has broadened its asphalt compaction range with the addition of the new ARP 95 K pivot-steer roller and the articulated ARX 90 and ARX 26 models. These units are available with Ammann’s proprietary ACE compaction systems to optim
  • What lies beneath Down Under
    January 11, 2021
    The third and final construction stage on Sydney’s WestConnex project has begun, including the underground Rozelle Interchange – with a lot of help from Komatsu
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.
  • Advanced road recycling systems
    March 15, 2012
    Advanced road recycling capabilities are offered by Wirtgen. Having started as a contractor, Wirtgen’s roots in this side of the business are strong and the company’s development of road recycling systems has become a core competence, originating as an offshoot of its contract work. Wirtgen’s leading position in the milling machine market continues and although an increasing number of rival firms offer machines, the company’s share of this segment remains dominant. With demand for machines having grown in 2