Skip to main content

Safer bridges

Barin is supplying a new underbridge inspection platform to a Canadian customer, as well as a unit to a firm in Russia. The ABC190/L for Canada is the first machine Barin has supplied to the country and the customer is rental company Jenik Construction, based in St Mathieu de Veloil. The platform is mounted on a five axle Freightliner M2-112 truck chassis and can operate from a single lane of traffic. It offers a bridge barrier clearance of 4.4m, a pavement/sidewalk clearance of 4.4m and a horizontal underb
July 2, 2012 Read time: 2 mins
The Barin platform bought by Uralmostrotroj on Russia will be used to inspect and maintain the Kama Bridge in Perm
1481 Barin is supplying a new underbridge inspection platform to a Canadian customer, as well as a unit to a firm in Russia. The ABC190/L for Canada is the first machine Barin has supplied to the country and the customer is rental company Jenik Construction, based in St Mathieu de Veloil. The platform is mounted on a five axle Freightliner M2-112 truck chassis and can operate from a single lane of traffic. It offers a bridge barrier clearance of 4.4m, a pavement/sidewalk clearance of 4.4m and a horizontal underbridge extension of 19m. The unit also offers a maximum underbridge vertical platform depth of 9m, a platform capacity of 600kg and a platform width of 1.3m. The platform can be fully deployed in 12 minutes, features manually-operated, vertical aluminium lift that can rise 2.5m with a 120kg load and offers a total GVW of 37tonnes.

The Russian unit is an ABC200/L model and was bought by Uralmostotroj based in Perm and will be used to maintain the Kama Bridge. The 500kg capacity platform is mounted on a 6x4 2394 Volvo FM400 chassis and offers a bridge barrier clearance of 2.1m, a sidewalk/pavement clearance of 2.7m, a horizontal underbridge outreach of 20m and a maximum vertical underbridge depth of 8.5m. Total GVW is 26tonnes and the machine can be fully deployed in 12 minutes, while it also features an aluminium lift with similar specifications to the Canadian machine that can be raised by 3m.

For more information on companies in this article

Related Content

  • The Sir Ambrose Shea lift bridge wins key award
    April 25, 2017
    The Sir Ambrose Shea lift bridge has received a transportation award of merit. The structure was designed by Parsons and has been given the 2017 Transportation Award of Merit from the Consulting Engineers of Ontario (CEO). As sole prime consultant, Parsons also provided project management and engineering services during construction. Located on the Avalon Peninsula in the town of Placentia, NL, the Sir Ambrose Shea Lift Bridge provides a connection while supporting the region’s commercial fishing industry.
  • Lochkov bridge construction time 'cut'
    July 17, 2012
    As part of the R1 southern orbital motorway around the Czech capital, Prague, a joint venture is building a five-span, 461m long and approximately 65m high viaduct near the village of Lochkov, as a girder bridge construction. For the two steeply inclined twin piers, Doka has supplied an automatic climbing formwork solution that obviates the need for shoring and that will "cut more than 100 days from the construction period." Cast-in-place concrete construction of bridge piers with such a steep inclination
  • Advances in road recycling and milling technology
    May 25, 2016
    Road milling and recycling play important roles in road building, with new models now coming to market - Mike Woof writes. The market for road milling machinery has become very competitive in recent times. In past years this sector of the construction machinery business was dominated by German firm Wirtgen, however there are now more companies active in the field and the leading companies offer a wider array of models than before. Wirtgen retains its market leadership and still offers the most comprehensive
  • Innovations in crushing and screening technology boosting efficiency
    July 15, 2015
    The crushing and screening sector has seen a flurry of new model launches in recent months, with a series of new equipment introductions - Mike Woof writes. Crushing and screening systems play a vital role in the overall cost effectiveness of a quarrying operation. Ensuring that a quarry runs efficiently relies heavily on the appropriateness of the entire crushing and screening set-up for the material input, the output grades and the compatibility of each separate unit. Mobility has been a key issue in rece