Skip to main content

A 'roller coaster' ride

The Gold Coast region in the Australian state of Queensland is internationally renowned as a tourist area attracting thousands of visitors from Brisbane, where the state's biggest ever road and bridge upgrade project is currently underway. Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels: the north is getting a completely new 7km section of motorway on a different alignment to bypass extra traffic, and tolls are being automated to speed flow
July 16, 2012 Read time: 3 mins
The Gold Coast region in the Australian state of Queensland is internationally renowned as a tourist area attracting thousands of visitors from Brisbane, where the state's biggest ever road and bridge upgrade project is currently underway.

Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels: the north is getting a completely new 7km section of motorway on a different alignment to bypass extra traffic, and tolls are being automated to speed flows.

At the heart of the project is a duplication of the 1.63km long Gateway Bridge, with its slim central soaring concrete arch, which was a world record holder in its time for a concrete box balanced cantilever bridge. The 260m long main span carrying three lanes of traffic each way, nearly 65m above the river, is still the biggest hollow concrete box construction anywhere.

The AU$1.88 billion (US$1.5 billion) Brisbane Gateway Upgrade Project in the state capital will help alleviate traffic congestion in the area and improve the vital link to the Gold Coast.

"The upgrade project will deliver many benefits to Queensland, including safer, quicker and easier travel on the Gateway Motorway; better connections for business, industry and tourism, and an overall improved situation for motorists, cyclists and pedestrians," says Jeremy Shaw, Conplant client services manager, the Australian distributor of Ammann products (some 40 Ammann rollers are in use on the project), which hired out all the machines on the south side of the project.
"The majority of the rollers on this site are Ammann products, ranging from
1-27tonne vibrating smooth and pad drum rollers, and are equipped with ROPS2 anti-roll technology.

"Worksites on the south side feature some very steep batters and abutments, so the ROPS2 technology is an excellent safety net, particularly for less experienced operators. There is next to no possibility of a rollover as long as the operator is following proper procedure, and there have been no rollover incidents on this project."

ROPS2 is a two-stage system that first alerts the operator with an audible alarm when a pre-determined gradient is reached, then shuts down the vibration if the machine continues to tilt, and was introduced to the Australian market in 2007.

Related Content

  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • South Africa bridge deals for Msikaba and Mtentu rivers by end 2016
    August 1, 2016
    The South African National Roads Agency (SANRAL) said it is on track to announce tender winners for two bridges, across the Msikaba River and Mtentu River, by the end of the year. The Msikaba River Bridge will be constructed on the N2 Wild Coast Toll Road and will consist of a cable-stayed 580m-long structure spanning a deep gorge. The Mtentu River Bridge, also on the N2 Wild Coast Toll Road and around 12km to the north of Msikaba River, is expected to be a concrete structure and nearl.y 1.2kkm long.
  • Solving congestion in Brisbane
    August 2, 2012
    Rapid growth in a major Australian city in recent years has created new problems for the infrastructure and especially transport Expansion in the city of Brisbane, the Queensland state capital and the third largest city in the country, is set to continue and some 1,500 people arrive/week from within Australia and from other parts of the world. At this rate by 2026 the city's population should increase by 1.4 million: at present it is 1.8 million. To cope, the Queensland government and city council have ini
  • The Australian Government has set a massive budget for infrastructure investment, including major spending on roads
    May 17, 2013
    The Australian Government is announcing plans to invest A$24 billion (US$23.73 billion) in transport infrastructure across the country. This will form the second part of the country’s five-year Nation Building Plan (NBP). The investment will be used to improve roads, railways and ports between 2014/2015 and 2018/2019. One stage of the NBP will involve spending A$525 million to upgrade and widen the M80 Ring Road in New South Wales (NSW) in a project that will include installing the latest traffic management