Skip to main content

Reliable lifting for Terex crane in Saudi Arabia

A Terex TR 90 rough terrain crane has performed reliably and productively in tough operating conditions in Saudi Arabia. The crane was used for lifting numerous components for drilling rigs, generators, and a power distribution and control centre at a site for Nabros in Abqaiq, in Saudi Arabia. The machine was provided by Saudi Arabia-based heavy equipment service provider Expertise Contracting Company. The crane was transported to the work site in Abqaiq on a lowbed trailer, which took three hours to t
October 5, 2018 Read time: 2 mins
Terex Crane’s team was able to provide assistance with commissioning and operation when the RT 90 crane was used in Saudi Arabia
A Terex TR 90 rough terrain crane has performed reliably and productively in tough operating conditions in Saudi Arabia.


The crane was used for lifting numerous components for drilling rigs, generators, and a power distribution and control centre at a site for Nabros in Abqaiq, in Saudi Arabia. The machine was provided by Saudi Arabia-based heavy equipment service provider Expertise Contracting Company.

The crane was transported to the work site in Abqaiq on a lowbed trailer, which took three hours to travel the 200km from Expertise Contracting Company’s yard. The machine’s versatility was another benefit as no additional transport vehicles were required. And once the RT 90 reached the work site, the crane operator needed just 10 minutes to get it ready to work. The crane completed most of the lifts solo, and only needed assistance when lifting a 60tonne steel container that housed the power distribution and control centre for the drilling zone. For this particular lift, a 1222 Terex RT 780 rough terrain crane was brought in to work with the RT 90 to complete the task as a tandem lift.

For more information on companies in this article

Related Content

  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • New EU-Russian highway connection
    February 18, 2013
    Among the forests and lakes of Finland, one of Europe's newest motorway links is being built as a Green highway linking Europe to Russia - Adrian Greeman reports The road eastwards from Finland's capital Helsinki, along the north coast of the Gulf of Finland, has not carried heavy traffic volumes, at least until recent times. Highway seven as it is designated locally, or E18 in European nomenclature, is partly motorway but in some sections still dual carriageway or even just a single lane each way, finishin
  • Challenging Colombian tunnel completed
    May 30, 2024
    A tunnel stretch on Colombia’s Santa Fe - Cañasgordas highway is complete – Mauro Nogarin reports
  • Eurotec batching plant for Madagascar port development
    April 13, 2023
    A Eurotec batching plant has played an important role for a Madagascar port development project.