Skip to main content

Record breaking ABM bridge beams installed near Raith, Scotland

One of the largest mobile cranes in the UK, a 1,500tonne capacity unit, recently positioned nine 90tonne 42m pre-stressed bridge beams by ABM Precast Solutions. The massive W-beams were hoisted into place at Junction 5, the Raith Interchange, on Scotland’s M74 motorway – part of the M8-M73-M74 motorway improvements project.
September 30, 2016 Read time: 2 mins
Up, up and away for ABM's W-beams

One of the largest mobile cranes in the UK, a 1,500tonne capacity unit, recently positioned nine 90tonne 42m pre-stressed bridge beams by 8508 ABM Precast Solutions.

The massive W-beams were hoisted into place at Junction 5, the Raith Interchange, on Scotland’s M74 motorway – part of the M8-M73-M74 motorway improvements project.

The Raith interchange is a noted pinch point in the Scottish motorway system, so installation took place in three night operations from midnight to four in the morning. The W-beams are among the largest bridge beams of this type fabricated in the UK in recent years. ABM are supplying precast structures to six other bridges on the £500 million project being delivered for Scottish Roads Partnership on behalf of Transport Scotland.

The beams were also the largest pre-stressed beams produced by ABM since a major upgrading of the company’s factory in the mid-England village of Tuxford.

Each W-beam was cast in purpose-built heated moulds ensuring rapid uniform curing to achieve the 50N/m2 stress load transfer strength. Each beam has more than a 1,700tonnes pre-stress load.

The loads were carried by Walker Haulage of Tuxford to the Scottish border - without escort.  Local police then escorted the steering bogie trailers to site to complete the near-420km journey.

For more information on companies in this article

Related Content

  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    June 25, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering*. Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s
  • M27 gets ESS bases from Marshalls Civils
    August 30, 2021
    Precast bases for electronic signalling systems help convert the UK's M27 into a smart motorway.
  • Sweco listed on Scotland’s Safety Multi-Supplier Framework
    November 1, 2019
    Engineering consultancy Sweco has won a place on the Scottish government’s Development Management and Road Safety Service Multi-Supplier Framework.
  • Bridges in Sunderland and Poland are being slid into place
    February 6, 2017
    Sunderland sees a bridge slide into place and two bridges inch their way across a Polish highway Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation likely to take place next year. The project to build the New Wear Crossing is now halfway through with the first half of the steel deck b