Skip to main content

Pumping aids tunnel improvement work

In the UK, the busy Dartford Tunnel has benefited from the use of powerful pumping technology during improvements intended to boost traffic flow. Pump hire specialist, Sykes Pumps, helped by providing a pumping system, so as to enable piling for the conversion programme to a fully-electronic payment infrastructure.
July 28, 2015 Read time: 2 mins
RSSIn the UK, the busy Dartford Tunnel has benefited from the use of powerful pumping technology during improvements intended to boost traffic flow. Pump hire specialist, 8165 Sykes Pumps, helped by providing a pumping system, so as to enable piling for the conversion programme to a fully-electronic payment infrastructure.

Providing a route across the River Thames linking Dartford in Kent with Thurrock in Essex, the Dartford Crossing forms part of the M25 Motorway and comprises two tunnels and a bridge. High traffic volumes have led to increased congestion at the toll booths over the past few years, leading to the 2309 Highways Agency’s decision to introduce a fully-electronic payment system, which requires remote payment online, by phone, via a payzone retail outlet, or by post.

The upgrade to the payment system necessitated significant changes to the infrastructure at the entrance to each of the tunnels and contractor, Jackson Civil Engineering, needed to carry out piling works to install new traffic management barriers. As the site is so close to the river, Jackson anticipated rising water when each pile was removed and brought in Sykes pumps to specify a pumping system that would remove any excess water prior to the concrete pour.

Sykes Pumps provided two GP 100M diesel pumps along with hoses and a settlement tank to create a flexible water attenuation system. The specified system disposed of low levels of nuisance water at the piles, using a duty pump.  Where piling work saw larger volumes of water, the standby pump was deployed and the water was transported 400m via hoses to the settlement tank, where sediment was removed before the water was released into the sewer system.

For more information on companies in this article

Related Content

  • Work zone safety with SRL's REMOS
    August 11, 2025
    REMOS allows one person off-site to manage several sites simultaneously, efficiently making interventions to prevent and eliminate bottlenecks.
  • Upgrade set to start of Budapest’s Széchenyi Chain Bridge
    April 4, 2017
    Budapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media. Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019. The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow B
  • Water defence
    February 17, 2012
    A new system for reducing the risks of road water run-off contamination is now available from HYDRO International. The firm's new Downstream Defender is said to be an advanced hydrodynamic separator and is designed to meet tough new European regulations for treatment of suspended solids and pollutants in surface water run-off.
  • Japanese pumping innovation from Tsurumi
    December 8, 2014
    Japanese pump manufacturer, Tsurumi, is introducing new drainage pumps to the European market. The new models include a new level sensor KTZE pump as well as the GPN415 and GPN 622 sand pumps. The new drainage KTZE pump is based on Tsurumi’s proven KTZ range, which suits heavy-duty applications. The new model is available in seven variants with power ratings from 1.5-3.7kW at 400V. The pump can deliver 430-1440litres/min, depending on the model and provides a maximum lifting head of 36.5m. The discharge