Skip to main content

Pumping aids tunnel improvement work

In the UK, the busy Dartford Tunnel has benefited from the use of powerful pumping technology during improvements intended to boost traffic flow. Pump hire specialist, Sykes Pumps, helped by providing a pumping system, so as to enable piling for the conversion programme to a fully-electronic payment infrastructure.
July 28, 2015 Read time: 2 mins
RSSIn the UK, the busy Dartford Tunnel has benefited from the use of powerful pumping technology during improvements intended to boost traffic flow. Pump hire specialist, 8165 Sykes Pumps, helped by providing a pumping system, so as to enable piling for the conversion programme to a fully-electronic payment infrastructure.

Providing a route across the River Thames linking Dartford in Kent with Thurrock in Essex, the Dartford Crossing forms part of the M25 Motorway and comprises two tunnels and a bridge. High traffic volumes have led to increased congestion at the toll booths over the past few years, leading to the 2309 Highways Agency’s decision to introduce a fully-electronic payment system, which requires remote payment online, by phone, via a payzone retail outlet, or by post.

The upgrade to the payment system necessitated significant changes to the infrastructure at the entrance to each of the tunnels and contractor, Jackson Civil Engineering, needed to carry out piling works to install new traffic management barriers. As the site is so close to the river, Jackson anticipated rising water when each pile was removed and brought in Sykes pumps to specify a pumping system that would remove any excess water prior to the concrete pour.

Sykes Pumps provided two GP 100M diesel pumps along with hoses and a settlement tank to create a flexible water attenuation system. The specified system disposed of low levels of nuisance water at the piles, using a duty pump.  Where piling work saw larger volumes of water, the standby pump was deployed and the water was transported 400m via hoses to the settlement tank, where sediment was removed before the water was released into the sewer system.

For more information on companies in this article

Related Content

  • Prepare for ‘interoperability on steroids’
    May 19, 2023
    The gathering of Europe’s toll professionals offers a chance for views to be exchanged by senior people on a number of big issues: and there’s currently an awful lot to think about
  • The Fehmarnbelt Tunnel, another Danish connection
    June 20, 2017
    The Fehmarnbelt Tunnel between Denmark and Germany is both ambitious and innovative, explains Susanne Kalmar Pedersen, project director at design engineering firm Ramboll, adviser to the client Fehmarn A/S. The ambitious Fehmarnbelt Tunnel - one of Europe’s largest ongoing infrastructure projects - is a priority project within the EU’s Trans European Network (TEN-T) programme. It will link the German island of Fehmarn with the Danish island of Lolland. The tunnel is an 18km immersed combined road and rail l
  • 2023 Global Road Achievement Award Winner - Environmental Mitigation: Xingyi Ring Expressway
    March 6, 2024
    An important road link in China has won a prestigious 2023 Global Road Achievement Award
  • Peri formwork for Danish port link tunnel project
    November 29, 2013
    The Nordhavnsvej – Vej- og Tunnelentreprise (Nordhavnsvej) project is Copenhagen’s largest infrastructure project in the last 50 years. The 1.65km-long route will eventually link the Danish capital’s northern port area with the Helsingør motorway. It runs through a very densely built urban area, in parts at depths of up to 22m. One particular challenge regarding the execution was planning the course of the tunnel because the underground structure also crosses a very busy railway line.