Skip to main content

Pumping aids tunnel improvement work

In the UK, the busy Dartford Tunnel has benefited from the use of powerful pumping technology during improvements intended to boost traffic flow. Pump hire specialist, Sykes Pumps, helped by providing a pumping system, so as to enable piling for the conversion programme to a fully-electronic payment infrastructure.
July 28, 2015 Read time: 2 mins
RSSIn the UK, the busy Dartford Tunnel has benefited from the use of powerful pumping technology during improvements intended to boost traffic flow. Pump hire specialist, 8165 Sykes Pumps, helped by providing a pumping system, so as to enable piling for the conversion programme to a fully-electronic payment infrastructure.

Providing a route across the River Thames linking Dartford in Kent with Thurrock in Essex, the Dartford Crossing forms part of the M25 Motorway and comprises two tunnels and a bridge. High traffic volumes have led to increased congestion at the toll booths over the past few years, leading to the 2309 Highways Agency’s decision to introduce a fully-electronic payment system, which requires remote payment online, by phone, via a payzone retail outlet, or by post.

The upgrade to the payment system necessitated significant changes to the infrastructure at the entrance to each of the tunnels and contractor, Jackson Civil Engineering, needed to carry out piling works to install new traffic management barriers. As the site is so close to the river, Jackson anticipated rising water when each pile was removed and brought in Sykes pumps to specify a pumping system that would remove any excess water prior to the concrete pour.

Sykes Pumps provided two GP 100M diesel pumps along with hoses and a settlement tank to create a flexible water attenuation system. The specified system disposed of low levels of nuisance water at the piles, using a duty pump.  Where piling work saw larger volumes of water, the standby pump was deployed and the water was transported 400m via hoses to the settlement tank, where sediment was removed before the water was released into the sewer system.

For more information on companies in this article

Related Content

  • Safe road barrier innovations
    March 8, 2012
    New road barrier concepts offer major gains in highway safety.
  • Norway’s massive Rogfast Tunnel project
    December 11, 2018
    The world's longest and deepest road tunnel is underway in western Norway - Adrian Greeman reports
  • Safety measures aid workzone accident reduction
    February 20, 2012
    Everyone connected with the highway industry is involved in the efforts to cut down the number of work zone accidents. Patrick Smith reports. A few months ago, as road work resumed on America's highways and bridges, US Transportation Secretary Ray LaHood called on drivers to use extra caution in work zones. At the same time he commended the success in reducing overall roadway fatalities in each of the last seven years.
  • Concrete removal using high pressure water jets
    April 11, 2012
    The use of high-pressure water jets to remove old concrete on structures is becoming increasingly popular Hydrodemolition of concrete structures by robotic equipment is becoming an increasingly used method for removing deteriorated concrete with high-pressure water techniques. It offers the selective removal of deteriorated concrete, while retaining sound concrete below the intended level of removal, a process that will not damage rebar or cause micro-cracks in the concrete, as will mechanical methods s