Skip to main content

Pumping aids tunnel improvement work

In the UK, the busy Dartford Tunnel has benefited from the use of powerful pumping technology during improvements intended to boost traffic flow. Pump hire specialist, Sykes Pumps, helped by providing a pumping system, so as to enable piling for the conversion programme to a fully-electronic payment infrastructure.
July 28, 2015 Read time: 2 mins
RSSIn the UK, the busy Dartford Tunnel has benefited from the use of powerful pumping technology during improvements intended to boost traffic flow. Pump hire specialist, 8165 Sykes Pumps, helped by providing a pumping system, so as to enable piling for the conversion programme to a fully-electronic payment infrastructure.

Providing a route across the River Thames linking Dartford in Kent with Thurrock in Essex, the Dartford Crossing forms part of the M25 Motorway and comprises two tunnels and a bridge. High traffic volumes have led to increased congestion at the toll booths over the past few years, leading to the 2309 Highways Agency’s decision to introduce a fully-electronic payment system, which requires remote payment online, by phone, via a payzone retail outlet, or by post.

The upgrade to the payment system necessitated significant changes to the infrastructure at the entrance to each of the tunnels and contractor, Jackson Civil Engineering, needed to carry out piling works to install new traffic management barriers. As the site is so close to the river, Jackson anticipated rising water when each pile was removed and brought in Sykes pumps to specify a pumping system that would remove any excess water prior to the concrete pour.

Sykes Pumps provided two GP 100M diesel pumps along with hoses and a settlement tank to create a flexible water attenuation system. The specified system disposed of low levels of nuisance water at the piles, using a duty pump.  Where piling work saw larger volumes of water, the standby pump was deployed and the water was transported 400m via hoses to the settlement tank, where sediment was removed before the water was released into the sewer system.

For more information on companies in this article

Related Content

  • New German autobahn bridge under constriuction
    May 1, 2015
    Crane manufacturer Manitowoc has supplied six Potain cranes to German contractor Max Bögl. These machines are being used for constructing a new bridge carrying the A3 autobahn, close to Limburg. Working at over 70m high, the cranes tower over the Lahn Valley. The cranes for this project were supplied by Max Bögl’s subsidiary, Max Bögl Transport & Geräte. The three topless Potain MDT 222 cranes were selected for the work as they feature tip heights of up to 76.2m and can operate with a working radius of
  • Kronprinsesse Marys Bro bridges Roskilde Fjord
    January 10, 2019
    A BESIX joint venture is giving the royal treatment to the new Kronprinsesse Marys Bro across Roskilde Fjord, writes David Arminas It was announced in September 2016 that Belgian group BESIX, in a joint venture (RBAI) with Italian firm Rizzani de Eccher and Spanish company Acciona Infraestructuras, had been chosen for the €133 million project. The award, by client Vejdirektoratet (Danish Road Directorate), marked the entry of BESIX into the Scandinavian market. Vejdirektoratet praised the winning bid as
  • Balfour Beatty wins Lower Thames deal
    January 24, 2023
    The Lower Thames Crossing will run under the River Thames, down river from London in the south-east of England.
  • Lower Thames Crossing contract – preferred bidder
    July 19, 2023

    The UK’s National Highways has announced that Skanska has been named the preferred bidder for the contract for the Lower Thames Crossing project.