Skip to main content

Potain’s new tower crane for global markets

Potain is launching its first hydraulic topless luffing jib crane, following tests on site with select dealers in Thailand, Australia and New Zealand. It is the first topless luffing jib model from Potain and its novel hydraulic technology is said to make it easier to assemble and faster to operate. Featuring new technology, the crane is said to combine the advantages of Potain’s MCR luffing jib cranes and MCT topless cranes. The machine is said to be straightforward to assemble and disassemble the crane
May 16, 2018 Read time: 3 mins
The new Potain MCH 125 tower crane is said to be easy and quick to erect
Potain is launching its first hydraulic topless luffing jib crane, following tests on site with select dealers in Thailand, Australia and New Zealand. It is the first topless luffing jib model from Potain and its novel hydraulic technology is said to make it easier to assemble and faster to operate.


Featuring new technology, the crane is said to combine the advantages of 5916 Potain’s MCR luffing jib cranes and MCT topless cranes. The machine is said to be straightforward to assemble and disassemble the crane on congested sites, suiting it to urban projects or job sites where space is limited.

Maximum capacity for the MCH 125 is 8tonnes, while the maximum jib length is 50m. Tip capacity is 2tonnes and maximum line speed is 100m/min when fitted with the 60 LVF 20 hoist. The crane’s design offers a number of advantages, including fast erection and dismantling. The topless design means less space is needed on site, as there is no cathead to assemble at ground level before installation.

The crane also uses Potain’s VVH hydraulic luffing technology for vertical movement of the jib, which eliminates the need for luffing wire ropes. With VVH technology, the MCH 125 is able to raise from a horizontal level to 87˚ in less than 2 minutes. The hydraulics are pre-connected at the factory, avoiding the need to perform this duty during on-site assembly.

The hydraulic luffing design means the crane has a shorter counter-jib and out-of-service radius when compared with rope-luffing alternatives, freeing up valuable space on congested job sites. The upperworks of the crane, including its full 50m of jib, can travel on just four trucks. Assembly to a height of 40m can be achieved in less than 6 hours.

Operation is said to be smooth and quiet; and for better utilisation for fleet owners it can be mounted on existing 1.6m or 2m mast sections from the manufacturer’s current range. Jib sections are from the MCR range of luffing jib cranes. There are five jib configurations available, ranging from 30m to 50m, in 5m increments.

The MCH 125 will be sold and supported through the extensive regional Potain dealer networks. The crane is available for sale throughout Asia, Africa, Oceania, the Middle East, Russia, the CIS countries and Latin America.

For more information on companies in this article

Related Content

  • Sennebogen upgrades 3300 E-series crawler crane from the ground up
    March 3, 2016
    Sennebogen has revised its 125tonne crawler crane, the 3300, from the ground up and optimised it to meet Tier 4f emission standards. A 186-kW diesel engine and a multi-circuit hydraulic system power the 160-kN winch at rope speeds of up to 105m/min with ease. A Star Lifter crawler undercarriage adds stability and allows the rig to be driven under load. Crawler tracks can be removed for transport, after which the base machine, at just 3.2m wide, can be easily transported. The Sennebogen self-assembly
  • Sennebogen upgrades 3300 E-series crawler crane from the ground up
    January 6, 2017
    Sennebogen has revised its 125tonne crawler crane, the 3300, from the ground up and optimised it to meet Tier 4f emission standards. A 186-kW diesel engine and a multi-circuit hydraulic system power the 160-kN winch at rope speeds of up to 105m/min with ease. A Star Lifter crawler undercarriage adds stability and allows the rig to be driven under load. Crawler tracks can be removed for transport, after which the base machine, at just 3.2m wide, can be easily transported. The Sennebogen self-assembly
  • New bridge under construction in Turkey
    March 28, 2014
    Work is underway on a new bridge structure in Turkey, with tower cranes playing a key role in the project The two Potain tower cranes are being used to build a 610m long cable-stayed bridge in the south-east of the country. The two cranes are MC235B models and are working 10 hours/day on the project, which is taking 30 months. The new bridge will provide an important connection across the Ataturk Dam Reservoir on the Euphrates River.
  • Counterweight technology key feature of new Manitowoc cranes
    January 6, 2017
    Manitowoc has introduced two new crawler cranes that feature what the company calls “game-changing” counterweight technology. The company introduced the 300tonne MLC300 and the 650tonne MLC650 on Wednesday. Among the features of the new cranes are their Variable Position Counterweight, or VPC.