Skip to main content

Potain’s new tower crane for global markets

Potain is launching its first hydraulic topless luffing jib crane, following tests on site with select dealers in Thailand, Australia and New Zealand. It is the first topless luffing jib model from Potain and its novel hydraulic technology is said to make it easier to assemble and faster to operate. Featuring new technology, the crane is said to combine the advantages of Potain’s MCR luffing jib cranes and MCT topless cranes. The machine is said to be straightforward to assemble and disassemble the crane
May 16, 2018 Read time: 3 mins
The new Potain MCH 125 tower crane is said to be easy and quick to erect
Potain is launching its first hydraulic topless luffing jib crane, following tests on site with select dealers in Thailand, Australia and New Zealand. It is the first topless luffing jib model from Potain and its novel hydraulic technology is said to make it easier to assemble and faster to operate.


Featuring new technology, the crane is said to combine the advantages of 5916 Potain’s MCR luffing jib cranes and MCT topless cranes. The machine is said to be straightforward to assemble and disassemble the crane on congested sites, suiting it to urban projects or job sites where space is limited.

Maximum capacity for the MCH 125 is 8tonnes, while the maximum jib length is 50m. Tip capacity is 2tonnes and maximum line speed is 100m/min when fitted with the 60 LVF 20 hoist. The crane’s design offers a number of advantages, including fast erection and dismantling. The topless design means less space is needed on site, as there is no cathead to assemble at ground level before installation.

The crane also uses Potain’s VVH hydraulic luffing technology for vertical movement of the jib, which eliminates the need for luffing wire ropes. With VVH technology, the MCH 125 is able to raise from a horizontal level to 87˚ in less than 2 minutes. The hydraulics are pre-connected at the factory, avoiding the need to perform this duty during on-site assembly.

The hydraulic luffing design means the crane has a shorter counter-jib and out-of-service radius when compared with rope-luffing alternatives, freeing up valuable space on congested job sites. The upperworks of the crane, including its full 50m of jib, can travel on just four trucks. Assembly to a height of 40m can be achieved in less than 6 hours.

Operation is said to be smooth and quiet; and for better utilisation for fleet owners it can be mounted on existing 1.6m or 2m mast sections from the manufacturer’s current range. Jib sections are from the MCR range of luffing jib cranes. There are five jib configurations available, ranging from 30m to 50m, in 5m increments.

The MCH 125 will be sold and supported through the extensive regional Potain dealer networks. The crane is available for sale throughout Asia, Africa, Oceania, the Middle East, Russia, the CIS countries and Latin America.

For more information on companies in this article

Related Content

  • Chinese Firm Zoomlion is launching its new crane featuring German technology from JOST
    April 15, 2012
    The first firm example of Chinese-European shared crane expertise is being unveiled today by Zoomlion. The Hunan-based manufacturer acquired technology from German-firm JOST and as a result is offering its novel T320 “topless” tower crane, the first in a new series of saddle jib machines from the firm. The new T320 tower crane is the first developed since Chinese purchase of JOST and meets all the European CE requirements for these machines. The crane combines quality German engineering with Zoomlion manufa
  • Liebherr cranes on the Rader
    December 10, 2024
    Germany’s Rader High Bridge spanning the Kiel Canal along Germany’s A7 motorway is to be replaced and widened over the next few years. Eighteen Liebherr cranes are handling the lifting.
  • Project underway for Chinese bridge
    May 15, 2014
    Potain tower cranes are being used to construct a major cable-stayed bridge in China. The conditions are tough and feature high winds and monsoon conditions, with the cranes working at an altitude of 1,500m above sea level in a mountain range in southern China to build the Duge Beipanjiang Bridge, which will span 720m when it is complete The job is requiring six Potain tower cranes in total during the course of the US$92.75 million (570 million RMB) project. Two cranes have been erected at the job site a
  • XCMG cranes aids in key Chinese bridge construction
    June 10, 2015
    Work to construct a key bridge in China has been aided by a crane supplied by XCMG The crane was used to erect 100m high twin bridge supports for the structure. The bridge is a dual-cable, pre-stressed concrete cable-stayed bridge featuring two towers. The bridge is located in Shandong and was recently opened to traffic. The project was not without its challenges. Building such a large bridge spanning the Yi River required sophisticated methodologies and use of the latest technology. Mounting the cab